Laserfiche WebLink
r►e a <br />BID/PROPOSAL " <br />CITY OF SOUTH BEND <br />Project Name: 2025 Curb and Sidewalk Replacement '�G5 <br />Project Number: 125-001 <br />For Bids Due: May 27th, 2025 at 9:30am <br />Contractor Name: Selge Construction Co., Inc. <br />ALTERNATE 1 <br />Item Description Quantity Unit Unit Price Total Amount <br />No. <br />1 CONCRETE SIDEWALK, REMOVE 986 SY $ 34.05 $ 33,573.30 <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />949 <br />SY <br />$ 63.50 <br />$ 60,261.50 <br />3 <br />CONCRETE CURB, REMOVE <br />965 <br />LF <br />$ 32.05 <br />$ 30,928.25 <br />4 <br />CONCRETE CURB, MODIFIED <br />965 <br />LF <br />$ 58.50 <br />$ 56,452.50 <br />5 <br />CONCRETE APPROACH, REMOVE <br />116 <br />SY <br />$ 30.05 <br />$ 3,485.80 <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />116 <br />SY <br />$ 138.00 <br />$ 16,008.00 <br />7 <br />CONCRETE CURB RAMP, REMOVE <br />27 <br />SY <br />$ 31.05 <br />$ 838.35 <br />8 <br />PERPENDICULAR CURB RAMP <br />27 <br />SY <br />$ 291.00 $ 7,857.00 <br />9 <br />TOPSOIL AND SEEDING <br />1284 <br />SY <br />$ 6.95 <br />$ 8,923.80 <br />10 <br />TREE, REMOVE, 10-IN <br />6 <br />EA <br />$ 1,225.00 <br />$ 7,350.00 <br />11 <br />TREE, REMOVE, 30-IN <br />6 <br />EA <br />$ 2,550.00 <br />$ 15,300.00 <br />12 <br />STUMP, REMOVE <br />5 <br />EA <br />$ 350.00 <br />$ 1,750.00 <br />13 <br />PLANT, DECIDUOUS TREE, SINGLE <br />STEM. 2-IN TO 2.5-IN <br />20 <br />EA <br />850.00 <br />$ <br />$ 17,000.00 <br />ALTERNATE 1 TOTAL $ 259,728.50 <br />[CONTINUED] <br />Version 1 /3/2025 Contractor's Bid for Public Works - 8 <br />