My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2025 Curb and Sidewalk Program Proj No 125-001 - Selge Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Bids
>
Opening of Bids - 2025 Curb and Sidewalk Program Proj No 125-001 - Selge Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 1:07:30 PM
Creation date
5/27/2025 2:15:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/27/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BIDIPROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: 2025 Curb and Sidewalk Replacement <br />Project Number: 125-001 <br />For Bids Due: May 27th, 2025 at 9:30am <br />Contractor Name: Selge Construction Co., Inc. <br />BASE BID <br />Item <br />No. <br />Descripfion <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />2783 <br />Sy <br />$ 30.50 <br />84,881.50 <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />2783 <br />Sy <br />$ 67.55 <br />$ 187,991.65 <br />3 <br />CONCRETE CURB, REMOVE <br />2420 <br />LF <br />$ 28.50 <br />$ 68,970.00 <br />4 <br />CONCRETE CURB, MODIFIED <br />2420 <br />LF <br />$ 60.20 <br />$ 145.684.00 <br />5 <br />CONCRETE APPROACH, REMOVE <br />546 <br />Sy <br />$ 26.50 <br />$ 14,469.00 <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />546 <br />Sy <br />127.00 <br />$ 69,342.00 <br />7 <br />CONCRETE CURB RAMP, REMOVE <br />85 <br />Sy <br />$ 27.50 <br />$ 2,337.50 <br />8 <br />PERPENDICULAR CURB RAMP <br />85 <br />SY <br />$ 261.00 <br />$ 22,185.00 <br />9 <br />TOPSOIL AND SEEDING 3103 <br />Sy <br />$ 5.25 <br />$ 16,290.75 <br />10 <br />TREE, REMOVE, 6-IN <br />2 <br />EA <br />$ 620.00 <br />$ 1,240.00 <br />11 <br />TREE, REMOVE, 10-IN <br />13 <br />EA <br />$ 1,425.00 <br />$ 18,525.00 <br />12 <br />TREE, REMOVE, 30-IN <br />19 <br />EA <br />$ 2,550.00 <br />$ 48,450.00 <br />13 <br />TREE, REMOVE, 48-IN <br />6 <br />EA <br />$ 4,075.00 <br />$ 24,450.00 <br />14 <br />STUMP, REMOVE <br />7 <br />EA <br />$ 350.00 <br />$ 2,450.00 <br />15 <br />1 PLANT, DECIDUOUS TREE, SINGLE <br />STEM. 2-IN TO 2.5-IN <br />53 <br />EA <br />$ 795.00 <br />$ 42,135.00 <br />BASE BID TOTAL $ 749.401.40 <br />[CONTINUED] <br />Version 1/3/2025 Contractor's Bid for Public Works - 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.