My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2025 Curb and Sidewalk Program Proj No 125-001 - Selge Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Bids
>
Opening of Bids - 2025 Curb and Sidewalk Program Proj No 125-001 - Selge Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 1:07:30 PM
Creation date
5/27/2025 2:15:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/27/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
*State of Indiana Certified MBE -DBE* <br />2213 St Charles Ave. <br />South Bend IN 46614 <br />FIN 46-3085979 <br />Date: 5/19/2025 <br />Project: South Bend 2025 Curb and Sidewalk Project <br />Project Location: South Bend, IN <br />Project No. N/A <br />Quote prepared for: Selge Construction <br />2025 Tri-axle rates <br />Regular rate... $125.00 <br />Overtime rate... $143.00 <br />2025 Quad -axle rates <br />Regular rate... $129.00 <br />Overtime rate... $147.00 <br />2025 Flatbed hourly rates <br />Regular rate... $125.00 <br />Overtime rate... $143.00 <br />■ Overtime consists of anything over 8 hours daily and all -day Saturday <br />• Travel time added to each trucks time ticket daily <br />• Night rates add $15.00 per hr to all rates per truck. 8 hour minimum per truck <br />• Sunday and holidays add $36.00 per hr to overtime rates, per truck. 8 hr minimum per truck <br />• Minimums apply: 2, 4 & 8 hours for all dump trucks <br />■ Minimum 4, 8 hours for flatbeds, local hauling only <br />• All dumps, flatbeds: Legal loads only <br />• Trucks will be upon availability because 1st Class does not have control of the project scheduling <br />• To avoid 2 hr show up charge call our dispatch 2 hrs before start time for any cancellations <br />• 1 st Class shall be compensated for all time spent on the jobsite <br />• Invoices due NET 30 <br />• Fuel surcharge applied if diesel costs rise above $4.25 a gallon, based on Midwest PADD 2 <br />• Signatory to Local 364 union <br />+ MBE certified supplier of aggregates <br />• Please notify our office if this project is awarded and if our guote will ,be used. <br />d3eAmxV d. C&Wte e. pvja. of emt 5/27/20 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.