REGULAR MEETING MAY 13, 2025 107 <br />Alternate 1 <br />$22,000 <br />Alternate 2 <br />$1,265 <br />Alternate 3 <br />$9,155 <br />Alternate 4 <br />$21,865.20 <br />Attorney Schmidt advised that the email submitted included several links to an iCloud account. <br />He downloaded the file that he read into the record, so that nothing could be changed after the fact. <br />Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the above <br />quotations were referred to Public Works and Community Investment for review and <br />recommendation. <br />AWARD BID AND APPROVE CONTRACT — WASTEWATER TREATMENT PLANT WAS <br />THICKENING IMPROVEMENTS — PROJECT NO. 123-031B (PR-00040816) <br />Jacob Klosinski, Engineering, advised the Board that on April 22, 2025, bids were received and <br />opened for the above referenced project. After reviewing those bids, Mr. Klosinski recommended <br />that the Board award the contract to the lowest responsive and responsible bidder, Bown <br />Engineering Corporation (Indianapolis, IN), in the amount of $4,756,000; Base Bid Total. <br />Therefore, VP Molnar made a motion that the recommendation be accepted, and the bid be <br />awarded, and the contract approved as outlined above. Mr. Miller seconded the motion, which <br />carried by roll call. <br />AWARD OUOTATION AND APPROVE CONTRACT — LIFT STATION #33 PLATFORM <br />REPLACEMENT AND GENERATOR PAINT — (PR-00040789) <br />Roger Oakley, Wastewater, advised the Board that on April 10, 2025, quotations were received <br />and opened for the above referenced project. After reviewing those quotations, Mr. Oakley <br />recommended that the Board award the contract to the lowest responsive and responsible quoter, <br />Premier 1 Construction, in the amount of $4,745. Therefore, VP Molnar made a motion that the <br />recommendation be accepted, and the quotation be awarded, and the contract approved as outlined <br />above. Mr. Miller seconded the motion, which carried by roll call. <br />APPROVE CHANGE ORDER NO. 1 — YSB AND SB THRIVE SUBDIVISION <br />IMPROVEMENTS —PROJECT NO. 123-011 (PO-0029777) <br />President Maradik advised that Jacob Klosinski, Engineering, has submitted change order number <br />1 on behalf of Rieth-Riley Construction Company, indicating the contract amount be increased by <br />$120,499.45 for a new contract sum, including this change order, in the amount of $3,446,871.04. <br />Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the change <br />order was approved. <br />APPROVE CHANGE ORDER NO. 1 — IRELAND RD. & IRONWOOD DR. INTERSECTION <br />IMPROVEMENTS — PROJECT NO. 123-050 (PO-0030685) <br />President Maradik advised that Dan Jones, Engineering, has submitted change order number 1 on <br />behalf of Milestone Contractors, L.P., indicating the contract amount be increased by $71,163.80 <br />for a new contract sum, including this change order, in the amount of $1,877,863.80. Upon a <br />motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the change order was <br />approved. <br />APPROVE CHANGE ORDER NO. 1 — PW SERVICE CENTER ROOFING REPLACEMENT <br />—PROJECT NO. R124-032B (PO-0036031) <br />President Maradik advised that Lidya Abreha, Engineering, has submitted change order number 1 <br />on behalf of Slatile Roofing and Sheet Metal Co., Inc., indicating the contract amount be increased <br />by $52,220.70 for a new contract sum, including this change order, in the amount of $951,032.70. <br />Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the change <br />order was approved. <br />APPROVE CHANGE ORDER NO. 1 (FINAL) AND PROJECT COMPLETION AFFIDAVIT <br />WASTEWATER TREATMENT PLANT YARD PIPING IMPROVEMENTS CONTRACT A — <br />PROJECT NO. 123-031A (PO-0030075) <br />President Maradik advised that Jacob Klosinski, Engineering, has submitted change order number <br />1 (final) on behalf of HRP Construction Inc., indicating the contract amount be increased by <br />$21,746 and additional thirty-two (32) days for a new contract sum, including this change order, <br />of $500,746 with a completion date of August 15, 2024. Also submitted was the project completion <br />