Laserfiche WebLink
<br /> <br /> <br />Proposal for Environmental & Site-Civil <br />Engineering on the Former <br />Drewry’s Brewery Parcel <br />Page 18 of 19 <br /> <br /> <br /> <br /> <br /> Final Submittal 240 Days <br />8 Bid Phase Services (Anticipated Jan. 2026 – Feb. 2026) Duration 45 Days <br />9 Limited Demolition Phase Administrative Services (Anticipated <br />Mar. 2026 – Aug. 2026) <br />Duration 150 Days <br />10 On-Site Observation for Soil Management Plans (Anticipated <br />Mar. 2026 – Aug. 2026) <br />Duration 150 Days <br /> <br />FEE <br />For performing the environmental and site-civil services as described herein, DLZ Indiana, LLC will be paid as <br />defined in the fee schedule below. Unless otherwise noted, the CLIENT shall pay DLZ on a Lump Sum basis. <br />Hourly rate tasks will be billed in accordance with DLZ’s Standard Fee Structure (see Exhibit C). <br />Task Description Fee <br />1 Project Administration and Coordination $35,200.00 <br />2 Subsurface Utility Investigation $26,800.00 <br />3 Topographic Survey Services <br /> Ground Survey $15,800.00 <br /> Boundary Survey $8,500.00 <br />4 Construction/Land Disturbance Storm Water Permitting $7,100.00 <br />5 Decommissioning Planning and Investigative Services $15,000.00 <br />6 Demolition Bid Document Development $64,700.00 <br />7 Engineer’s Opinion of Probable Costs $10,500.00 <br />8 Bid Phase Services $8,000.00 <br />9 Limited Demolition Phase Administrative Services (Hourly Rate) $42,400.00 <br /> Total Fee $234,000.00 <br />10 As-Needed Allowance - On-Site Observation for Soil Management Plan <br />(Hourly Rate)* <br /> <br /> On-Site Representative $64,000.00 <br /> Verification Sample Lab Costs (assume 20 samples X $350 per sample) $7,000.00 <br /> Preparation of Final Summary Report $6,000.00 <br /> Total As-Needed Allowance $77,000.00 <br />*Estimated fee amount. Amendment may be requested based on actual requirements of IDEM <br />approved Soil Management Plan. <br /> <br />Fees will be invoiced on a monthly basis. The total not-to-exceed fee for this Proposal is $311,000.00. <br />