Laserfiche WebLink
<br /> <br /> <br />Proposal for Environmental & Site-Civil <br />Engineering on the Former <br />Drewry’s Brewery Parcel <br />Page 6 of 19 <br /> <br /> <br /> <br /> <br />4. Submit final application to IDEM Regulatory ePortal along with $100 IDEM permit fee. Submit <br />State Form 56679 via mail no later than 48 hours prior to start of construction. <br />5. If requested, assist with submission of Notice of Termination form via the IDEM Regulatory <br />ePortal at completion of construction. <br /> <br />TASK 5 – DECOMMISSIONING PLANNING AND INVESTIGATIVE SERVICES <br />A. Historic Document Review <br />1. DLZ will research plans and information available to document the existing conditions of the <br />site. Portions of these plans may be copied and/or formatted for reproduction for inclusion <br />within the bidding documents for informational purposes or made available to demolition <br />contractors as a reference source as part of the bidding of the Project. <br />2. DLZ will utilize existing site and facility drawings as available to document the approximate <br />locations of building foundations, on-site public/private utility lines, individual service lines for <br />miscellaneous fluids, wiring, or other related services installed by any previous contractors for <br />individual building/structure connections. This information, if available, may be included <br />within the bidding documents for informational purposes only. It is agreed and understood <br />that, based on the age and size of the Project facility, as well as the limited documentation of <br />the existing facilities, a significant number of items may remain undocumented and left to the <br />potential bidders to research for bidding purposes. <br />3. DLZ will conduct visual site walk throughs to review the general observable condition of the <br />overall site and to verify construction items identified during the review of available plans. <br />4. DLZ will coordinate with CLIENT personnel to document, to the extent known, underground <br />items that may be encountered as part of the demolition of this facility. This documentation <br />is not intended to be all-inclusive and will be limited to the information provided by CLIENT. <br />The intent is to identify items that may be missed or labeled in-appropriately by standard <br />aboveground survey practices. Items may include known underground tanks, probable <br />foundations, and major active utilities. This will also include privately owned connections <br />between buildings or lines that are identified in the historical documents or as provided by the <br />CLIENT. <br />B. Site Utility Coordination and Analysis <br />1. DLZ understands that utility services may have been installed, extended, and abandoned <br />throughout the life of this facility. DLZ will perform the following limited utility coordination: <br />notifying all affected utilities in the project limits, meetings with affected utilities to review