My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Drewry's Brewery Cleanup, Phase III Proj No 119-031E - DLZ Indiana
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Drewry's Brewery Cleanup, Phase III Proj No 119-031E - DLZ Indiana
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 1:54:53 PM
Creation date
5/13/2025 1:54:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />Proposal for Environmental & Site-Civil <br />Engineering on the Former <br />Drewry’s Brewery Parcel <br />Page 6 of 19 <br /> <br /> <br /> <br /> <br />4. Submit final application to IDEM Regulatory ePortal along with $100 IDEM permit fee. Submit <br />State Form 56679 via mail no later than 48 hours prior to start of construction. <br />5. If requested, assist with submission of Notice of Termination form via the IDEM Regulatory <br />ePortal at completion of construction. <br /> <br />TASK 5 – DECOMMISSIONING PLANNING AND INVESTIGATIVE SERVICES <br />A. Historic Document Review <br />1. DLZ will research plans and information available to document the existing conditions of the <br />site. Portions of these plans may be copied and/or formatted for reproduction for inclusion <br />within the bidding documents for informational purposes or made available to demolition <br />contractors as a reference source as part of the bidding of the Project. <br />2. DLZ will utilize existing site and facility drawings as available to document the approximate <br />locations of building foundations, on-site public/private utility lines, individual service lines for <br />miscellaneous fluids, wiring, or other related services installed by any previous contractors for <br />individual building/structure connections. This information, if available, may be included <br />within the bidding documents for informational purposes only. It is agreed and understood <br />that, based on the age and size of the Project facility, as well as the limited documentation of <br />the existing facilities, a significant number of items may remain undocumented and left to the <br />potential bidders to research for bidding purposes. <br />3. DLZ will conduct visual site walk throughs to review the general observable condition of the <br />overall site and to verify construction items identified during the review of available plans. <br />4. DLZ will coordinate with CLIENT personnel to document, to the extent known, underground <br />items that may be encountered as part of the demolition of this facility. This documentation <br />is not intended to be all-inclusive and will be limited to the information provided by CLIENT. <br />The intent is to identify items that may be missed or labeled in-appropriately by standard <br />aboveground survey practices. Items may include known underground tanks, probable <br />foundations, and major active utilities. This will also include privately owned connections <br />between buildings or lines that are identified in the historical documents or as provided by the <br />CLIENT. <br />B. Site Utility Coordination and Analysis <br />1. DLZ understands that utility services may have been installed, extended, and abandoned <br />throughout the life of this facility. DLZ will perform the following limited utility coordination: <br />notifying all affected utilities in the project limits, meetings with affected utilities to review
The URL can be used to link to this page
Your browser does not support the video tag.