My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - UST & AST Replacement Design for Wastewater Treatment Pits Proj No 124-035 - TY Lin International
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
PSA - UST & AST Replacement Design for Wastewater Treatment Pits Proj No 124-035 - TY Lin International
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 1:54:24 PM
Creation date
5/13/2025 1:53:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Page 5 <br />(Exhibit D - Resident Project Representative) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />c. Observe whether all items on the final list have been completed or corrected and make <br />recommendations to Engineer concerning acceptance and issuance of the Notice of <br />Acceptability of the Work (Exhibit E). <br />H. Resident Project Representative shall not: <br />1. Authorize any deviation from the Contract Documents or substitution of materials or <br />equipment (including “or-equal” items). <br />2. Exceed limitations of Engineer’s authority as set forth in this Agreement. <br />3. Undertake any of the responsibilities of Contractor, Subcontractors or Suppliers. <br />4. Advise on, issue directions relative to, or assume control over any aspect of the means, <br />methods, techniques, sequences or procedures of Contractor’s work. <br />5. Advise on, issue directions regarding, or assume control over security or safety practices, <br />precautions, and programs in connection with the activities or operations of Owner or <br />Contractor. <br />6. Participate in specialized field or laboratory tests or inspections conducted off-site by <br />others except as specifically authorized by Engineer. <br />7. Accept shop drawing or sample submittals from anyone other than Contractor. <br />8. Authorize Owner to occupy the Project in whole or in part. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.