• Furnish and install all required line voltage to connect the new furnaces to the existing electrical circuits. <br />• Furnish and install all required line voltage to connect the new condensers to the existing electrical whips/circuits. <br />• Furnish and install one (1) Carrier low voltage twinning kit (#AGATWNDTE0IA) to join the operation of the two furnaces, <br />matching the operation and sequencing of the existing systems. <br />• Reconnect all applicable low voltage wiring to the new furnaces and condensers. <br />o Existing thermostats will be reused. <br />• Pressure test the existing refrigerant piping with Nitrogen to a minimum of 350 PSI for atleast 24 hours to ensure no leaks <br />are present. <br />o Our pricing is based on reusing the existing refrigerant piping. The piping will be pressure tested and checked to <br />ensure no leaks are present. <br />o We have verified with Carrier that the existing refrigerant piping sizes will work for the new equipment. <br />• Flush the existing refrigerant piping with Nu-Calgon RX11 refrigerant line flush and Nitrogen to ensure all impurities <br />including debris, oils, moisture and other non-condensables have been removed from the system. <br />• Furnish and install Type "L" OXY/ACR nitogenized (cleaned and capped) copper with cleaned and bagged fittings to <br />reconnect the existing refrigerant piping to the new coils and condensers. <br />o Includes a new filter drier for each condensing unit. <br />o All fittings will be brazed with 15% silver brazing alloy. <br />• Furnish and install %" thick Armaflex rubber insulation on all new interior refrigeration suction piping. <br />o Insulation work performed by Valley Insulating Co. of Mishawaka. <br />• Furnish and install %" thick Armaflex rubber insulation on all new and existing exterior refrigerant suction piping associated <br />with these two condensing units. <br />o Insulation work performed by Valley Insulating Co. of Mishawaka. <br />o Does not include reinsulating the exterior refrigerant suction piping associated with the other, existing condensing <br />units. The insulation on these lines is rotten and has fallen off. The lack of insulation greatly reduces the efficiency <br />of the refrigeration systems. We would suggest that while the insulator is on site, they provide a price for your <br />consideration to reinsulate these other existing lines. <br />• Pressure test the completed refrigerant system to a minimum of 350 PSI to ensure no leaks are present. <br />• Triple evacuate each system to a final standing vacuum of 250 microns or less to ensure a clean, tight system with no <br />debris, moisture or other non-condensables. <br />• Charge each system with new, virgin, R-410A refrigerant in accordance with the manufacturer's specifications and charging <br />instructions. <br />• Provide documented start-up of the new furnace and A/C systems in accordance with the manufacturer's requirements. <br />• Includes clean-up and demobilization for our scope of work. <br />• Includes all applicable permits with the City of South Bend Building Department for our scope of work. <br />• Includes a full one (1) year labor and material warranty on all Edward J. White, Inc. furnished and installed material and <br />equipment associated with this project. <br />o The new condensing units are furnished with a one (1) year parts and five (5) year compressor parts warranty. The <br />new furnaces are furnished with a one (1) year parts and twenty (20) year heat exchanger parts warranty. <br />We will perform the work as described above for the sum of Forty -Nine Thousand Seven Hundred Thirty -Four and 00/100 Dollars <br />($49,734.00). Does not include sales tax or work associated with other HVAC systems on site. <br />All material is currently in stock and available in approximately 1 week from date of order. <br />Our proposal must be accepted within 14 days of this quotation, otherwise, our pricing is null and void! We are backlogged for <br />summer and need to complete this work prior to June 1(or as close to that as possible) to make this work with our schedule. We <br />could start this work right away (within a few days of award). <br />