Laserfiche WebLink
et <br />VIKUL vaired, �WPYI%Afjte? <br />n� <br />Plarmbing • Heating • Air Conditioning • Boilers <br />Commercial • Residential • hiditstrial <br />April 30, 2025 <br />Slatile Roofing & Sheet Metal Co. <br />Attn: Ken Hoy <br />1703 S. Ironwood Dr. <br />South Bend, IN 46613 <br />Re: A/C System Replacements <br />Dear Mr. Hoy: <br />We are pleased to quote you on the work associated with the replacement of the air conditioning systems for AC-1 and AC-4, as well <br />as the furnaces associated with AC-4, on the site of the City of South Bend Traffic & Lighting Building at 731 South Lafayette <br />Boulevard in South Bend, Indiana. To provide clarity to our quotation, all items are laid out in a start -to -finish work sequence. We <br />propose to perform the following: <br />• Disconnect and remove the existing Carrier twinned vertical cased coils from furnace systems AHU-1 and AHU-4 and discard <br />off -site. <br />o All utilities will be taken back to a point suitable for reconnection. <br />• Disconnect and remove the existing humidifiers and discard off -site. <br />o All utilities associated with the humidifiers will be demolished and removed. The water lines will be permanently <br />capped to prevent future leaks. <br />• Disconnect and remove the twinned furnaces for system AHU-4 and discard off -site. <br />• Modify the existing return air base for AHU-4 as required to accommodate the new furnaces. <br />• Furnish and install two (2) Carrier 96% efficient, 60k BTU furnaces for system AHU-4 and set on the original return air <br />plenum base. <br />o Carrier Furnace M#: 59SC6A060M17-16 <br />• Furnish and install two (2) Carrier twinned, cased vertical coils with thermal expansion valves (TXV's) and set on top of the <br />new and existing furnaces. <br />o Carrier Coil M#: CAVTCOIL408A00 <br />• Furnish and install two (2) Carrier 7.5 Ton, 460V/30, single circuit condensers with two -stage compressors and set on the <br />wood supports on the roof. <br />o New wood supports furnished and installed by Slatile. We will add additional wood supports on top of these to <br />support our new units as needed. <br />o New units are to be hoisted to the roof by Slatile when they are setting the other existing units. <br />• Furnish and install all applicable sheet metal as required to build new supply air transition pieces to connect between the <br />new cased coils and the existing supply air ductwork. <br />• Furnish and install 1%" thick x %# density foil faced fiberglass ductwrap on the new supply ductwork transition pieces and <br />tie-in to the existing duct insulation. <br />• Furnish and install 2" Schedule 40 PVC pipe with DWV pattern solvent welded fittings to connect the new furnaces to the <br />existing furnace 2" intake and exhaust pipes. <br />• Furnish and install Schedule 40 carbon steel pipe and fittings to connect the new furnaces to the existing furnaces. <br />• Furnish and install Schedule 40 PVC pipe with pressure pattern solvent welded fittings to connect the new furnaces and <br />cased coils to the existing condensate piping system. <br />,10E VqUI�r <br />1011 South Michigan Street • South Bend, IN 46601 <br />Phone: (574) 289-6351 • Fax: (574) 289-3755 <br />OQ ® www.ejwhiteinc.net <br />Licensed— Bonded— Insured IN License #CP81021273 <br />