Laserfiche WebLink
BID/PROPOSAL Addendum No. 2 <br />CITY OF SOUTH BEND <br />70. <br />Line, Thermoplastic, Solid, Yellow, 4", Grooved <br />205 <br />LFt <br />$ 2.10 <br />$ 430.50 <br />71, <br />Line, Thermoplastic, Solid, Blue, 4" <br />160 <br />LFT <br />$ 10.20 <br />$ 1,632.00 <br />72. <br />Line, Thermoplastic, Solid, White, 6" <br />440 <br />LFT <br />$ 1.95 <br />$ 858.00 <br />73. <br />Transverse Line, Thermoplastic, White, 24", Stop Bar <br />75 <br />LFT <br />$ 9.25 <br />$ 693.75 <br />74. <br />Transverse Line, Thermoplastic, White, 24", Crosswalk <br />380 <br />LFT <br />$ 9.25 <br />$ 3,515.00 <br />75. <br />Pavement Message Marking, Multicomponent, Tabled Intersection <br />6 <br />EA <br />$ 425.00 <br />2,550.00 <br />76. <br />Pavement Message Marking, Multicomponent, Handicap Space <br />2 <br />EA <br />$ 150.00 <br />$ 300.00 , <br />77. <br />Temporary Fence <br />1 <br />LS <br />$ 25,000.00 <br />P 25,000.00 <br />Base Bid <br />Total $ 2,559,630.45 <br />Add Alternate A - Raised Intersection <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />Al. <br />Construction Engineering <br />1 <br />LS <br />$ 2,500.00 <br />$ 2,500.00 <br />A2. <br />OMITTED <br />A3. <br />HMA Surface (Deduct) <br />(35) <br />TON <br />$ 116.25 <br />$ (4,068.75)._ <br />A4. <br />HMA Intermediate (Deduct) <br />(55) <br />TON <br />$ 103.24 <br />$ (5,678.75) <br />A5. <br />HMA Base (Deduct) <br />(130) <br />TON <br />$ 88.00 <br />$ 11 440.00 <br />A6. <br />Joint Adhesive (Deduct) <br />(310) <br />LFT <br />$ 2.70 <br />$ (837.00) <br />A7. <br />PCCP, 8" <br />295 <br />SYD <br />$ 100.50 <br />$ 29,647.50 <br />A8. <br />PCCP, Colored, 8" <br />95 <br />SYD <br />$ 145.00 <br />$ 13,775.00 <br />A9. <br />D-1 Contraction Joint <br />230 <br />LFT <br />$ 28.00 <br />$ 6,440.00 <br />A10. <br />Concrete Curb <br />210 <br />LFT <br />$ 54.50 <br />$ 11,445.00 <br />Al1. <br />Concrete Curb and Gutter, Type B (Deduct) <br />(210) <br />LFT <br />$ 39.50 <br />$ (8,295.00) <br />Al2. <br />Line, Thermoplastic, Solid, White, 6" (Deduct) <br />(195) <br />LFT <br />$ 1.95 <br />$ (380.25) <br />A13. <br />Transverse Line, Thermoplastic, White, 24", Crosswalk (Deduct) <br />(190) <br />LFT <br />$ 9.25 <br />$ (1,757.50) <br />A14. <br />Pavement Message Marking, Multicomponent, Tabled Intersection <br />3 <br />EA <br />$ 425.00 <br />$ 1,275.00 <br />Alternate A <br />Total $ 32,625.25 <br />Base Bid and Alternate A <br />Total $ 2,592,255.70 <br />Bidder (Firm): Selge Construction Co., Inc. <br />Address: 2833 South 11th Street <br />City/State/Zip: Niles Telephone Number: (269 ) 684-0842 <br />�- �, <br />(Signature) <br />Robert P. Kuhns, PE, VP Estimating <br />(Printed Name of Person Submitting) <br />Version 5/20/2024 Contractor's Bid for Public Works - 9 <br />