BIDIPROPOSAL Addendum No. 2
<br />CITY OF SOUTH BEND
<br />32.
<br />PCCP, Colored, 6"
<br />25
<br />SYD
<br />$ 140.00
<br />;$ 3,500.00
<br />33.
<br />PCCP for Approaches, 6"
<br />80
<br />SYD
<br />$ 95.00
<br />$ 7,600.00 ,
<br />34.
<br />PCCP for Approaches, 8"
<br />155
<br />SYD
<br />$ 103.00
<br />$ 15,965.00
<br />35.
<br />D-1 Contraction Joint
<br />105
<br />LFT
<br />$ 28.00
<br />$ 2,940.00
<br />36.
<br />Concrete Curb
<br />1,265
<br />LFT
<br />$ 54.50
<br />$ 68,942.50
<br />37.
<br />OMITTED
<br />38.
<br />Concrete Curb and Gutter, Type B
<br />2,325
<br />LFT
<br />$ 39.50
<br />$ 91,837.50
<br />39.
<br />Concrete Curb and Gutter, Depressed
<br />300
<br />LFT
<br />$ 28.00
<br />$ 8,400.00
<br />40.
<br />Concrete Sidewalk, 4"
<br />1,700
<br />SYD
<br />$ 54.25
<br />$ 92,225.00
<br />41.
<br />Concrete Curb Ramp
<br />250
<br />SYD
<br />$ 170.00
<br />42,500.00
<br />42.
<br />Concrete Curb Ramp, Colored
<br />140
<br />SYD
<br />$ 140.00
<br />$ 19,600.00
<br />43.
<br />Detectable Warning Surface
<br />50
<br />SYD
<br />$ 280.00
<br />$ 14,00lY.VV-''-
<br />44.
<br />Mulched Seeding, Type "U"
<br />8,400
<br />SYD
<br />$ 1.30
<br />$ 10,920.00
<br />45.
<br />Sodding
<br />3,000
<br />SYD
<br />$ 8.00
<br />$ 24,000.00
<br />46.
<br />Street Tree
<br />27
<br />EA
<br />$ 695.00
<br />$ 18,765.00
<br />47.
<br />Storm Sewer Manhole, 48"
<br />16
<br />EA
<br />$ 5,200.00
<br />$ 83,200.00
<br />48.
<br />Storm Sewer Catch Basin
<br />7
<br />EA
<br />$ 4,100.00
<br />$ 28,700.00
<br />49.
<br />OMITTED
<br />50.
<br />OMITTED
<br />51.
<br />Storm Sewer Pipe, 12"
<br />1,193
<br />LFT
<br />$ 109.25
<br />$ 130,335.25
<br />52.
<br />Storm Sewer Pipe, Water Main Grade, 12"
<br />44
<br />LFT
<br />$ 136.00
<br />$ 5,984.00�
<br />53.
<br />Storm Sewer Pipe, 18"
<br />583
<br />LFT
<br />$ 109.00
<br />$ 63.547.00
<br />54.
<br />Storm Sewer Pipe, Water Main Grade, 18"
<br />75
<br />LFT
<br />$ 141.00
<br />:$ 10,575.00
<br />55.
<br />OMITTED
<br />56.
<br />OMITTED
<br />57.
<br />Underground Storm Sewer System
<br />1
<br />LS
<br />$ 540,000.00
<br />$ 540,000.00
<br />58.
<br />Fire Hydrant, Assembly
<br />1
<br />EA
<br />$ 19,250.00
<br />$ 19,250.00
<br />59.
<br />Water Main, 4"
<br />30
<br />LFT
<br />$ 205.00
<br />,$ 6,150.00
<br />60.
<br />Bend, 45 Degree, 4"
<br />4
<br />EA
<br />$ 565.00
<br />$ 2,260.00
<br />61.
<br />OMITTED
<br />62.
<br />Adjust Casting to Grade
<br />8
<br />EA
<br />$ 700.00
<br />:$ 5,600.00--
<br />63.
<br />Sheet Sign, 0.080 in.
<br />128
<br />SFT
<br />$ 24.00
<br />$ 3,072.00
<br />64.
<br />Sheet Sign, 0.125 in.
<br />15
<br />SFT
<br />$ 29.00
<br />$ 435.00
<br />65.
<br />Sign Post, Square, Type 2, Reinforced Anchor Base
<br />325
<br />LFT
<br />$ 20.00
<br />$ 6,500.00
<br />66.
<br />Solar Powered Flashing Pedestrian Crossing Signage Assembly
<br />2
<br />EA
<br />$ 12,000.00
<br />.$ 24,000.00
<br />67.
<br />Lighted Bollard
<br />8
<br />EA
<br />$ 5,000.00
<br />$ 40,000.00
<br />68.
<br />Line, Thermoplastic, Solid, White, 4"
<br />1,875
<br />LFT
<br />$ 1.10
<br />;$ 2,062.50
<br />69,
<br />Line, Thermoplastic, Solid, White, 4", Grooved
<br />880
<br />LFT
<br />$ 2.10
<br />$ 1,848.00
<br />Version 5/20/2024 Contractor's Bid for Public Works - 8
<br />
|