Laserfiche WebLink
BIDIPROPOSAL Addendum No. 2 <br />CITY OF SOUTH BEND <br />32. <br />PCCP, Colored, 6" <br />25 <br />SYD <br />$ 140.00 <br />;$ 3,500.00 <br />33. <br />PCCP for Approaches, 6" <br />80 <br />SYD <br />$ 95.00 <br />$ 7,600.00 , <br />34. <br />PCCP for Approaches, 8" <br />155 <br />SYD <br />$ 103.00 <br />$ 15,965.00 <br />35. <br />D-1 Contraction Joint <br />105 <br />LFT <br />$ 28.00 <br />$ 2,940.00 <br />36. <br />Concrete Curb <br />1,265 <br />LFT <br />$ 54.50 <br />$ 68,942.50 <br />37. <br />OMITTED <br />38. <br />Concrete Curb and Gutter, Type B <br />2,325 <br />LFT <br />$ 39.50 <br />$ 91,837.50 <br />39. <br />Concrete Curb and Gutter, Depressed <br />300 <br />LFT <br />$ 28.00 <br />$ 8,400.00 <br />40. <br />Concrete Sidewalk, 4" <br />1,700 <br />SYD <br />$ 54.25 <br />$ 92,225.00 <br />41. <br />Concrete Curb Ramp <br />250 <br />SYD <br />$ 170.00 <br />42,500.00 <br />42. <br />Concrete Curb Ramp, Colored <br />140 <br />SYD <br />$ 140.00 <br />$ 19,600.00 <br />43. <br />Detectable Warning Surface <br />50 <br />SYD <br />$ 280.00 <br />$ 14,00lY.VV-''- <br />44. <br />Mulched Seeding, Type "U" <br />8,400 <br />SYD <br />$ 1.30 <br />$ 10,920.00 <br />45. <br />Sodding <br />3,000 <br />SYD <br />$ 8.00 <br />$ 24,000.00 <br />46. <br />Street Tree <br />27 <br />EA <br />$ 695.00 <br />$ 18,765.00 <br />47. <br />Storm Sewer Manhole, 48" <br />16 <br />EA <br />$ 5,200.00 <br />$ 83,200.00 <br />48. <br />Storm Sewer Catch Basin <br />7 <br />EA <br />$ 4,100.00 <br />$ 28,700.00 <br />49. <br />OMITTED <br />50. <br />OMITTED <br />51. <br />Storm Sewer Pipe, 12" <br />1,193 <br />LFT <br />$ 109.25 <br />$ 130,335.25 <br />52. <br />Storm Sewer Pipe, Water Main Grade, 12" <br />44 <br />LFT <br />$ 136.00 <br />$ 5,984.00� <br />53. <br />Storm Sewer Pipe, 18" <br />583 <br />LFT <br />$ 109.00 <br />$ 63.547.00 <br />54. <br />Storm Sewer Pipe, Water Main Grade, 18" <br />75 <br />LFT <br />$ 141.00 <br />:$ 10,575.00 <br />55. <br />OMITTED <br />56. <br />OMITTED <br />57. <br />Underground Storm Sewer System <br />1 <br />LS <br />$ 540,000.00 <br />$ 540,000.00 <br />58. <br />Fire Hydrant, Assembly <br />1 <br />EA <br />$ 19,250.00 <br />$ 19,250.00 <br />59. <br />Water Main, 4" <br />30 <br />LFT <br />$ 205.00 <br />,$ 6,150.00 <br />60. <br />Bend, 45 Degree, 4" <br />4 <br />EA <br />$ 565.00 <br />$ 2,260.00 <br />61. <br />OMITTED <br />62. <br />Adjust Casting to Grade <br />8 <br />EA <br />$ 700.00 <br />:$ 5,600.00-- <br />63. <br />Sheet Sign, 0.080 in. <br />128 <br />SFT <br />$ 24.00 <br />$ 3,072.00 <br />64. <br />Sheet Sign, 0.125 in. <br />15 <br />SFT <br />$ 29.00 <br />$ 435.00 <br />65. <br />Sign Post, Square, Type 2, Reinforced Anchor Base <br />325 <br />LFT <br />$ 20.00 <br />$ 6,500.00 <br />66. <br />Solar Powered Flashing Pedestrian Crossing Signage Assembly <br />2 <br />EA <br />$ 12,000.00 <br />.$ 24,000.00 <br />67. <br />Lighted Bollard <br />8 <br />EA <br />$ 5,000.00 <br />$ 40,000.00 <br />68. <br />Line, Thermoplastic, Solid, White, 4" <br />1,875 <br />LFT <br />$ 1.10 <br />;$ 2,062.50 <br />69, <br />Line, Thermoplastic, Solid, White, 4", Grooved <br />880 <br />LFT <br />$ 2.10 <br />$ 1,848.00 <br />Version 5/20/2024 Contractor's Bid for Public Works - 8 <br />