AIA Document A1330 - 2019 <br />Standard Form of Agreement Between Owner and Construction Manager as Constructor <br />where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum <br />Price <br />§ 7.4.2 Costs,of materials described in the preceding Section 7.4.1 in excess of those actually <br />installed to allow for reasonable waste and spoilage. Unused excess materials, if any, shall <br />become the Owner's property at the completion of the Work or, at the Owner's option, shall be <br />sold by the Construction Manager. Any amounts realized from such sales shall be credited to the <br />Owner as a deduction from the Cost of the Work. <br />§ 7.5 Costs of Other Materials and Equipment, Temporary Facilities and Related Items <br />§ 7.5.1 Costs of transportation, storage, installation, dismantling, maintenance, and removal of <br />materials, supplies, temporary facilities, machinery, equipment and hand tools not customarily <br />owned by construction workers that are provided by the Construction Manager at the site and <br />fully consumed in the performance of the Work. Costs of materials, supplies, temporary <br />facilities, machinery, equipment, and tools, that are not fully consumed, shall be based on the <br />cost or value of the item at the time it is first used on the Project site less the value of the item <br />when it is no longer used at the Project site. Costs for items not fully consumed by the <br />Construction Manager shall mean fair market value. <br />§ 7.5.2 Rental charges for temporary facilities, machinery, equipment, and hand tools not <br />customarily owned by construction workers that are provided by the Construction Manager at the <br />site, and the costs of transportation, installation, dismantling, minor repairs, and removal of such <br />temporary facilities, machinery, equipment, and hand tools. Rates and quantities of equipment <br />owned by the Construction Manager, or a related party as defined in Section 7.8, shall be subject <br />to the Owner's prior approval. The total rental cost of any such equipment may not exceed the <br />purchase price of any comparable item. <br />§ 7.5.3 Costs of removal of debris from the site of the Work and its proper and legal disposal. <br />§ 7.5.4 Costs of the Construction Manager's site office, including general office equipment and <br />supplies. <br />§ 7.5.5 Costs of materials and equipment suitably stored off the site at a mutually acceptable <br />location, subject to the Owner's prior approval. <br />§ 7.6 Miscellaneous Costs <br />§ 7.6.1 Premiums for that portion of insurance and bonds required by the Contract Documents <br />that can be directly attributed to this Contract. <br />§ 7.6.1.1 Costs for self-insurance, for either full or partial amounts of the coverages required by <br />the Contract Documents, with the Owner's prior approval. <br />§ 7.6.1.2 Costs for insurance through a captive insurer owned or controlled by the Construction <br />Manager, with the Owner's prior approval. <br />IA Document A133 - 2019. Copyright - 1991, 2003, 2009, and 2019. All rights re1 served. "The American Institute of 2 <br />Architects," "American Institute of Architects," "AIA," the AIA All <br />and "AIA Contract Documents" are trademarks of The I <br />American Institute of Architects. This draft was produced at 08:52: 26 ET on 10/11/2023 under Order No. 2114477497 which <br />expires on 10/10/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the <br />AIA Contract Documents' Terms of service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: <br />