Laserfiche WebLink
AIA Document A133® - 2019 <br />Standard Form of Agreement Between Owner and Construction Manager as Constructor <br />where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum <br />Price <br />be reimbursed. Costs included in the Construction Manager's self -performed portion of the Work <br />shall not be reimbursed as part of any other section in Article 7. <br />§ 7.2 Labor Costs <br />§ 7.2.1 Wages or salaries of construction workers directly employed by the Construction <br />Manager to perform the construction of the Work at the site or, with the Owner's prior approval, <br />at off -site workshops. <br />§ 7.2.2 Wages or salaries of the Construction Manager's supervisory and administrative <br />personnel when stationed at the site and performing Work, with the Owner's prior approval. <br />§ 7.2.2.1 Wages or salaries of the Construction Manager's supervisory and administrative <br />personnel when performing Work and stationed at a location other than the site, but only for that <br />portion of time required for the Work, and limited to the personnel and activities listed below: <br />(Identify the personnel, type of activity and, if applicable, any agreed upon percentage of time to <br />be devoted to the Work.) <br />Senior Project Manager/Director, Project Manager, and Project Engineer when performing <br />management and administrative activities for the Project. <br />§ 7.2.3 Wages and salaries of the Construction Manager's supervisory or administrative <br />personnel engaged at factories, workshops or while traveling, in expediting the production or <br />transportation of materials or equipment required for the Work, but only for that portion of their <br />time required for the Work. <br />§ 7.2.4 Costs paid or incurred by the Construction Manager, as required by law or collective <br />bargaining agreements, for taxes, insurance, contributions, assessments and benefits and, for <br />personnel not covered by collective bargaining agreements, customary benefits such as sick <br />leave, medical and health benefits, holidays, vacations and pensions, provided such costs are <br />based on wages and salaries included in the Cost of the Work under Sections 7.2.1 through 7.2.3. <br />§ 7.2.5 If agreed rates for labor costs, in lieu of actual costs, are provided in this Agreement, the <br />rates shall remain unchanged throughout the duration of this Agreement, unless the parties <br />execute a Modification. Rates for the personnel listed in Exhibit 2 shall be used in lieu of actual <br />costs. Rates shall be adjusted on an annual basis on July I" of each year. <br />§ 7.3 Subcontract Costs <br />Payments made by the Construction Manager to Subcontractors in accordance with the <br />requirements of the subcontracts and this Agreement. <br />§ 7.4 Costs of Materials and Equipment Incorporated in the Completed Construction <br />§ 7.4.1 Costs, including transportation and storage at the site, of materials and equipment <br />incorporated, or to be incorporated, in the oompleted construction. <br />IA Document A133 - 2019. Copyright 1991, 2003, 2009, and 2019. All rights reserved. "The American Institute of no <br />Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The L <br />American Institute of Architects. This draft was produced at 09: 52:26 ET on 10/11/2023 under Order No.2119977497 which <br />expires on 10/1112014, is not for resale, is licensed for one-time use only, and may only be used in accordance with the <br />AIA Contract Documents" Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.eom. <br />User Notes: <br />