Laserfiche WebLink
#Materials Qty Price Total <br />12 Asphalt Rf(a) - Professional Installation of New Complete Roofing <br />System <br />14.00 $550.00 $7,700.00 <br />This line item cover complete install of your roofing system. For the 1st and 2nd story roof up to approx <br />16squares of roofing. Laying down ice, and water shield, (90lb) synthetic felt, starter strip, drip edge, and <br />shingles starting from the eves and working our way back to the ridge. Where we will install a ridge vent, <br />with cap to complete your roof if applicable. <br />Followed by a thorough cleanup and disposal of debris into the dumpster/s <br />Work Scope; <br />* This estimate does not include building a new front porch, I will have that on a separate estimate, along <br />with the siding estimate. <br />13 Cedar Shake - Tear Off 14.00 $150.00 $2,100.00 <br />This line item is for the tear off and disposal of the small cedar shake shingles that are on the base layer of <br />the roof. These will be torn down, when the top two layers are also being torn off. <br />14 Chimney Repair(m) - Counter Flashing (w/ Roof)1.00 $450.00 $450.00 <br />Throughout sides of the chimney or wall, attached and sealed to prevent leaks on top of regular flashing. <br />And ensure an even flow on to the shingles and away from the wall/chimney to prevent leaks. <br />#Products Qty Price Total <br />15 Disposal(m) - Dumpster 20yd 1.00 $500.00 $500.00 <br />Cost to load and haul away old materials, installation waste and associated debris for up to (4tons). <br />If the debris goes over on weight it's an extra $40 per ton. <br />Subtotal $14,320.00 <br />Grand Total ($)$14,320.00 <br />Deposit Due $8,592.00 <br />Payment Schedule <br />Deposit (60.00%)$8,592.00 <br />Accepted payment methods <br />Credit Card, Check, Cash, PayPal <br />Message <br />I would be happy to have an opportunity to work with you. <br />For projects over $20,000, a draw schedule will be in place of a 50% due upon acceptance of estimate and prior <br />to scheduling of work, 25% due on the day work begins, and the balance of the contract due the day of project <br />completion unless otherwise agreed upon in writing by project consultant and customer. <br />Terms