REGULAR MEETING APRIL 23, 2013 125 <br />amount of $16,000.00 each for a total of S32,000.00 for two. Therefore, Ms. Roos made a <br />motion that the recommendation be accepted and the bid be awarded as outlined above. Mr. Inks <br />seconded the motion, which carried. <br />AWARD BID — ONE 1 PRE -OWNED 2012 OR NEWER MID -SIZE FOUR DOOR SEDAN <br />AUTOMOBILE WITH HYBRID TRAIN 2013 ENGINEERING CAPITAL LEASE <br />PRINCIPAL AND INTEREST <br />Mr. Jeffrey Hudak, Central Services„ advised the Board that on March 26, 2013, bids were <br />received and opened for the above referenced vehicle. After reviewing those bids, Mr. Hudak <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />Jordan Motors, 609 East Jefferson Boulevard, Mishawaka, Indiana 46545, in the amount of <br />$24,640.00. Therefore, Ms. Roos made a motion that the recommendation be accepted and the <br />bid be awarded as outlined above. Mr. Inks seconded the motion, which carried. <br />AWARD BID — TWO(2),2013 OR NEWER FOUR DOOR HYBRID UTILITY VEHICLES <br />2013 CAPITAL BUDGET — SAFETY & RISK/WATER WORKS <br />Mr. Jeffrey Hudak, Central Services, advised the Board that on March 26, 2013, bids were <br />received and opened for the above referenced vehicles. After reviewing those bids, Mr. Hudak <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />Jordan Motors, Inc., 609 East Jefferson Boulevard, Mishawaka, Indiana 46545, in the amount of <br />$22,435.00 each for a total of $44,870.00 for two. Therefore, Ms. Roos made a motion that the <br />recommendation be accepted and the bid be awarded as outlined above. Mr. Inks seconded the <br />motion, which carried. <br />AWARD BID — TWO 2 PRE -OWNED 2012 OR NEWER COMPACT FOUR DOOR <br />SEDAN AUTOMOBILES PARK DEPARTMENT CAPITAL/CODE ENFORCEMENT <br />CAPITAL) <br />Mr. Mr. Jeffrey Hudak, Central Services, advised the Board that on March 26, 2013, bids were <br />received and opened for the above referenced vehicles. After reviewing those bids, Mr. Hudak <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />Jordan Motors, Inc., 609 East Jefferson Boulevard, Mishawaka, Indiana 46545, in the amount of <br />$14,740.00 each for a total of $29,480.00 for two. Therefore, Mr. Inks made a motion that the <br />recommendation be accepted and the bid be awarded as outlined above. Ms. Roos seconded the <br />motion, which carried. <br />APPROVAL OF REQUEST TO REJECT BID — ONE 1 OR MORE NEW HEAVY DUTY <br />MOBILE LIFTING SYSTEM <br />In a memorandum to the Board, Mr. Jeffrey Hudak, Central Services, requested permission to <br />reject the sole bid received for the above referenced equipment. It was noted the sole bidder did <br />not meet the unit's specifications and did not include a bid bond as required. Therefore, upon a <br />motion made by Ms. Roos, seconded by Mr. Inks and carried, the above request was approved. <br />AWARD UOTATION — 2013 CURB AND SIDEWALK PROGRAM — TREE REMOVAL — <br />PROJECT NO. 113-011A(MVH/CURB AND SIDEWALKI <br />Mr. Paul South, Director of Streets, advised the Board that on April 9, 2013, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Mr. <br />South recommended that the Board award the contract to the lowest responsive and responsible <br />bidder, KC Tree, Inc., 1320 Third Street, Osceola, Indiana, 46561, in unit prices bid. Mr. South <br />noted that Mark Temple Tree submitted a bid that was found non -responsive because they did <br />not submit their Non -Collusion, Non -Debarment Certification form. Therefore, Mr. Inks made a <br />motion that the recommendation be accepted and the quotation be awarded as outlined above. <br />Ms. Roos seconded the motion, which carried. <br />AWARD QUOTATION — 2013 PAVEMENT PROGRAM — COLD MILLING --w PROJECT <br />NO. 113-012 STREETS/PAVING <br />Mr. Paul South, Director of Streets, advised the Board that on April 9, 2013, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Mr. <br />South recommended that the Board award the contract to the lowest responsive and responsible <br />bidder, J.L. Milling, Inc., 15262 Industrial Drive, Vicksburg, Michigan, 49087, in unit prices bid. <br />Therefore, Mr. Gilot made a motion that the recommendation be accepted and the quotation be <br />awarded as outlined above. Mr. Inks seconded the motion, which carried. <br />