Laserfiche WebLink
<br /> Page 3 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />electronic review copy of the RF Report for review. Within 14 calendar days of receipt, Owner shall <br />submit to Engineer comments regarding the RF Report and any other deliverables. <br /> <br />The Engineer shall revise the RF Report in response to the Owner’s comments, as appropriate, and furnish <br />one electronic copy of the revised Report within 14 calendar days of receipt of Owner’s comments. <br /> <br />Task 105 – Project Management and Administration <br />Engineer will support the Owner by managing the project to coordinate evaluation or alternatives between <br />engineering disciplines, monitor and control the project budget and schedule, and keep the Owner <br />informed of project progress and issues necessary for success of the project. Engineer will provide project <br />supervision, direction, and coordination with the Owner’s management and staff. Project administration <br />and management also includes budget and schedule control, client management support, document control, <br />coordination of activities, monthly invoicing, and project close-out. Engineer will maintain a change <br />register of any scope changes affecting the project budget or schedule and review it with the Owner <br />monthly. Engineer shall discuss and receive written approval for any scope changes from the Owner prior <br />to proceeding. <br />1. Consult with Owner to define and clarify Owner’s requirements for the Project and <br />available data. <br />2. Advise Owner of any need for Owner to provide data or services of the types described in <br />Exhibit B which are not part of Engineer’s Basic Services. <br />3. Identify, consult with, and analyze requirements of governmental authorities having <br />jurisdiction to approve the portions of the Project designed or specified by Engineer, <br />including but not limited to mitigating measures identified in the environmental <br />assessment. <br />4. Identify and evaluate [insert specific number or list here] alternate solutions available to <br />Owner and, after consultation with Owner, recommend to Owner those solutions which in <br />Engineer’s judgment meet Owner’s requirements for the Project. <br />5. Prepare a report (the “Report”) which will, as appropriate, contain schematic layouts, <br />sketches, and conceptual design criteria with appropriate exhibits to indicate the agreed-to <br />requirements, considerations involved, and those alternate solutions available to Owner <br />which Engineer recommends. For each recommended solution Engineer will provide the <br />following, which will be separately itemized: opinion of probable Construction Cost; <br />proposed allowances for contingencies; the estimated total costs of design, professional, <br />and related services to be provided by Engineer and its Consultants; and, on the basis of <br />information furnished by Owner, a summary of allowances for other items and services <br />included within the definition of Total Project Costs. <br />6. Perform or provide the following additional Study and Report Phase tasks or deliverables: <br />[here list any such tasks or deliverables]