Laserfiche WebLink
• R <br />Breckinridge County Schools • � ,s • CMTA <br />Guaranteed Energy Savings Contract 9 ' <br />Annual Reconciliation Report (2023-2024) 00 <br />Irvington Elementary School <br />Irvington Elementary School saved $5,050 in utility costs due to Solar PV production, resulting in a shortfall <br />of $1,383 (-21%) savings relative to the guaranteed $6,433. <br />Table 5-28: Irvington Elementary School Savings Breakdown <br />Figures 5-29 shows the Year 4 electrical solar production. As noted above, the solar inverter at this site <br />failed on May 10, 2024 and was replaced by CMTA on Jull 11, 2024. As such, there was no solar production <br />during that two -month period. The inverter was RMA'd within 5 days of the system failure, however it took <br />the manufacturer 6 weeks to send a replacement unit, hence the extended amount of lost savings. <br />Irvington Elementary Solar Production <br />90,000 <br />80,000 <br />70,000 <br />60,000 <br />k <br />W 50,000 <br />h <br />40,000 <br />30,000 <br />20,000 <br />10,000 <br />0 <br />���e��yt CPO` e�Q,e �¢ye�ozc Na°Jai ��`aa� ���� V91\,�ti� °�Jy~ <br />8,990 <br />.6,401 <br />Figure 5-29: Irvington Elementary School Solar Production kWh Tracking Year 4 <br />Page Content is Subject to Confidentiality Restrictions <br />5-15 <br />9519 Civic Way, Suite 100 1 Prospect, KY 40059 1502.409.4062 1 cmta.com <br />Performance Contracting I MEP Engineering I Zero Energy Engineering I Technology I Commissioning <br />