My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - SBFD & MLK GESC Proj No 125-008 - CMTA
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Qualifications - SBFD & MLK GESC Proj No 125-008 - CMTA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 4:18:23 PM
Creation date
1/28/2025 11:43:42 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/28/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Breckinridge County Schools � �■ s� � CMTA <br />Guaranteed Energy Savings Contract <br />Annual Reconciliation Report (2023-2024) <br />The following section outlines the performance of the solar PV arrays at the installed facilities. Solar PV <br />performance is not measured relative to a building's baseline, but instead actual electrical production is <br />measured relative to guaranteed electrical production. In each figure, there is a guaranteed production <br />level (blue line), and an actual production level (green line). When the actual performance (green line) is <br />above the guaranteed performance (blue line), that Solar PV Array is outperforming the guarantee, <br />resulting in excess savings for the Breckinridge County Schools. Each building includes a Year 4 summary <br />to create a clear depiction of how each facility's array is performing. <br />Note that the solar inverter at Irvington Elementary School failed on May 10, 2024 and was replaced under <br />warranty by CMTA at no cost to Breckinridge County Schools on July 11, 2024. As such, there was no solar <br />production at Irvington Elementary School during the 2-month period where there was no functioning <br />inverter at that site. <br />Hardinsburg Elementary School <br />Hardinsburg Elementary School saved $6,871 in utility costs due to Solar PV production, yielding $492 <br />(8%) excess savings from the guaranteed $6,379. <br />Table 5-26: Hardinsburg Elementary School Savings Breakdown <br />Figures 5-27 shows the Year 4 electrical solar production. <br />100,000 1 <br />90,000 <br />80,000 <br />70,000 <br />k 50,000 <br />w <br />h 50,000 <br />40,00{0 <br />30,000 <br />20,000 <br />10,000 <br />0 <br />Hardinsburg Elementary Solar Production <br />i e.4 e� 6 6 <br />0 <br />Figure 5-27: Hardinsburg Elementary School Solar Production kWh Tracking Year 4 <br />CIA AI5 <br />1,507 <br />Page Content is Subject to Confidentiality Restrictions <br />5-14 <br />9519 Civic Way, Suite 100 1 Prospect, KY 40059 1502.409.4062 1 cmta.com <br />Performance Contracting I M EP Engineering I Zero Energy Engineering I Technology I Commissioning <br />
The URL can be used to link to this page
Your browser does not support the video tag.