Laserfiche WebLink
Breckinridge County Schools <br />Guaranteed Energy Savings Contract <br />Annual Reconciliation Report (2023-2024) <br />3,000,oao <br />2,500,000 <br />2,{]00,000 <br />k <br />W 1,500,0d0 <br />h <br />11000,000 <br />500,000 <br />0 <br />5.000 — <br />7,OM <br />6,000 — <br />5,000 <br />k <br />W 4,000 <br />3,000 <br />2,000 <br />1,000 <br />0 <br />BCHS Electric kWh Tracker <br />• R <br />CMTA <br />Q� �� PQ `` o� <br />isO 10 <br />O <br />Figure 5-2: Breckinridge County High School Electric kWh Tracking Year 4 <br />BCHS Electric kW Tracker <br />cL �� a� ce at1 yyc <br />Nao <br />O <br />Figure 5-3: Breckinridge County High School Electric kW Tracking Year 4 <br />2,396,640 <br />1,178,175 <br />961,680 <br />7.371 <br />3,332 <br />3,195 <br />Page Content is Subject to Confidentiality Restrictions <br />5-2 <br />9519 Civic Way, Suite 100 1 Prospect, KY 40059 1502.409.4062 1 cmta.com <br />Performance Contracting I MEP Engineering I Zero Energy Engineering I Technology I Commissioning <br />