My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - SBFD & MLK GESC Proj No 125-008 - CMTA
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Qualifications - SBFD & MLK GESC Proj No 125-008 - CMTA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 4:18:23 PM
Creation date
1/28/2025 11:43:42 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/28/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RFQ Response for Guaranteed Energy Savings Contract <br />South Bend Central Fire Station & MILK Dream Center Solar PV <br />City of South Bend, Indiana <br />go 00 CMTA <br />through a competitive bidding process. CMTA has HVAC and controls technicians on staff to facilitate the commissioning <br />of work, but we do not install any work ourselves. The table below lists items that are self -performed vs. subcontracted. <br />HVAC Audit <br />Lighting Installation (Skilled Trades) Labor <br />Controls Audit <br />Electrical Installation (Skilled Trades) Labor <br />Lighting Audit <br />HVAC System Installation (Skilled Trades) Labor <br />Energy Analysis <br />HVAC Controls Installation (Skilled Trades) Labor <br />Rate Analysis <br />Window System Design <br />Energy Procurement <br />Window System Installation <br />HVAC System Engineered Drawings/Plans <br />Roof Replacement Design <br />HVAC System Specifications <br />Roof Replacement Installation <br />Lighting Engineered Drawings/Plans <br />Equipment Maintenance Services <br />Lighting Specifications <br />Electrical Power Engineered Drawings/Plans <br />Electrical Power Specifications <br />HVAC Controls System Drawings/Specifications <br />Light Fixture Bidding and Procurement <br />HVAC Equipment Bidding and Procurement <br />HVAC System Commissioning <br />HVAC Controls Commissioning <br />Energy Management Services <br />Equipment Maintenance Services <br />Solar Design <br />Construction Management <br />Measurement and Verification <br />Envelope Testing <br />Page 1 5 Page content is proprietary and confidential <br />3 — Company Background and Qualifications <br />Performance Contracting I MEP Engineering I Zero Energy Eng' <br />
The URL can be used to link to this page
Your browser does not support the video tag.