Laserfiche WebLink
RFQ Response for Guaranteed Energy Savings Contract 0 •0 • CMTA <br />South Bend Central Fire Station & MS...6LK Dream Center Solar PV <br />City of South Bend, Indiana • • 0 <br />CMTA has all the required technical and construction management expertise on staff to design and stamp drawings, calculate <br />energy savings, model building performance, manage subcontractors during construction, commission systems after installation <br />and measure and verify systems performance. <br />CMTA approaches all of our projects as a long-term partnership with our clients. The success of our previous projects is a direct <br />result of the trust that is established between CMTA and the maintenance and custodial personnel that operate this facility on a <br />daily basis after our projects are complete. The better the building users understand the systems and how they should operate, <br />the more successful both our clients and CMTA are. <br />CMTA therefore includes training for all maintenance and custodial personnel in our project, addressing the efficient operation <br />and maintenance of both existing and new ECM equipment. Perhaps even more valuable than that, we develop a relationship <br />with the operations, maintenance, and custodial staff so they can contact us for help or questions. We maintain these <br />relationships with all of our clients after each project. CMTA will work with the City of South Bend to identify the appropriate staff <br />for each training session and will then create an overall training plan. <br />In addition, CMTA also provides consulting engineering, where we design complete mechanical, electrical, and plumbing systems <br />for many types of projects, including schools, hospitals, federal buildings, and universities. Energy efficiency is always an integral <br />part of each of these projects. <br />c. List any awards and accreditations. If Provider is not nationally accredited as an ESCO, explain why. <br />CMTA is nationally accredited as an ESCO. We have received many awards, including 60 ASHRAE awards in the last five years. Our <br />list of awards can be found in Appendix A. <br />d. Provider's Engineering Qualifications and Management <br />i. Number of years company has operated in Indiana: CMTA had an office in Jeffersonville, Indiana from 2011-2019, then <br />moved the office to Indianapolis in 2020. We have therefore operated in Indiana for 13 years. <br />ii. Number of employees residing in Indiana: CMTA has 17 employees in our Indiana office. <br />iii. Company Officers: President: James Benson. Chief Financial Officer: Tim Morris. Vice President, Business Development: <br />Tony Hans. Vice President, Energy Solutions: Jeremy Smith. Vice President: Kevin Mussler. <br />iv. Identify Professional Engineers directly employed by the Provider responsible for this project. Include License number of <br />the person responsible for the project. Jim Messner, PE, LEED AP — IN #PE11100544. Johnathan Stewart, PE, LEED AP <br />BD+C, WELL AP, NABCEP — KY #30179. Matthew Anderson, PE, NABCEP, PVCMS, PVIP — VA #0402067390. <br />v. List the personnel employed by the Provider responsible for this project. Identify Professional Engineer(s) directly employed <br />by the ESCO responsible for this project and include their License number(s). Attach a resume (1 page or less) on each <br />person, listing education, experience, work history and responsibilities on this project. Resumes and an organizational chart <br />can be found in Appendix B. Principal -in -Charge: Konrad Kutter, NABCEP, PVIP, PVSI. Project Manager: Matthew <br />Anderson, PE, NABCEP PVCMS, PVIP — VA #0402067390. Electrical Engineer: Jim Messner, PE, LEED AP — IN #PE11100544. <br />Electrical Engineer: Johnathan Stewart, PE, LEED AP BD+C, WELL AP, NABCEP — KY #30179. Solar Engineer: Clint Gentry, <br />NABCEP. Solar Engineer: Alec Schweitzer, EIT, LEED AP BD+C, NABCEP, WELL AP. Construction Manager: Tom Owen. <br />Onsite Service & Commissioning: Darrell Pittman, CEM; Doug Keyes. <br />e. The most recent audited Financial Report. This report can be found in Appendix C. <br />f. The provider must be certified and meet the requirements of IC 4-13.6-4 and the RFQ submitted must attach a copy of the <br />firm's certification of qualification issued under IC 4-13.6-4. This certificate is provided in Attachment D. <br />g. Describe if the Provider is a manufacturer, contractor, or engineering firm. Clearly delineate what services or products the <br />Provider is including from their own company as part of the project. CMTA is an engineering firm. Subcontractors will be <br />responsible for the installation of equipment in all disciplines and will be selected, with the aid of the City of South Bend, <br />Page 14 Page content is proprietary and confidential <br />3 — Company Background and Qualifications <br />Performance Contracting I MEP Engineering I Zero Energy Engineering I Technology I Commissioning <br />