My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - SBFD & MLK GESC Proj No 125-008 - CMTA
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Qualifications - SBFD & MLK GESC Proj No 125-008 - CMTA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 4:18:23 PM
Creation date
1/28/2025 11:43:42 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/28/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Breckinridge County Schools <br />Guaranteed Energy Savings Contract <br />Annual Reconciliation Report (2023-2024) <br />Scope of Work Summary <br />CMTA <br />The following narratives describe the Energy Conservation Measures included in the scope of the project <br />per Exhibit D of the contract. <br />H1: HVAC Renovations <br />Breckinridge County High School: <br />- Removed existing chiller and boiler plants, removal of existing VAV air handling units <br />- Installed new geothermal wellfield and variable air volume water source heat pumps <br />- VAV box terminal unit replaced throughout school <br />- Installed water -to -water heat pumps and condensing boiler for VAV box reheat loop <br />- Installed outside air energy recovery unit and alterations to exhaust air system <br />Custer Elementary School: <br />- Replaced 13 existing DX/Propane Packaged Rooftop Units <br />- Installed 2 new Rooftop Units in place of existing PTAC and Ductless Mini Split units. <br />H2: HVAC Control System Upgrades <br />This ECM included full DDC control system upgrade as a part of the new HVAC system installations and <br />implementation of equipment schedules, optimal start logic, demand limiting controls sequences, and <br />other energy saving controls sequences. Existing legacy controls systems were integrated into the new <br />web -based front end. <br />Facilities: Breckinridge County High School, Breckinridge County Middle School, Custer Elementary <br />School, Ben Johnson Elementary <br />H3: HVAC Controls Retro-Commissioning <br />HVAC Controls retro-commissioning was performed at schools with existing DDC controls systems. This <br />ECM ensured that the existing buildings, equipment, and systems achieved their maximum possible <br />performance. Retro-commissioning activities systematically addressed any deviations or shortcomings in <br />setpoints, scheduling, and controls sequences as well as targeting any failed components in the controls <br />systems that negatively affected building energy performance. <br />Facilities: Breckinridge County High School, Breckinridge County Middle School, Custer Elementary <br />School, Ben Johnson Elementary <br />Page Content is Subject to Confidentiality Restrictions <br />2-1 <br />9519 Civic Way, Suite 100 1 Prospect, KY 40059 1502.409.4062 1 cmta.com <br />Performance Contracting I MEP Engineering I Zero Energy Engineering I Technology I Commissioning <br />
The URL can be used to link to this page
Your browser does not support the video tag.