RFQ Response for Guaranteed Energy Savings Contract
<br />South Bend Central Fire Station & MLK Dream Center Solar PV
<br />City of South Bend, Indiana
<br />CMTA
<br />CMTA's philosophy is to identify drastic energy reductions, then supplement this with renewable energy. The less renewable
<br />energy needed, the less space needed for renewables, and the lower the cost. The term "building electrification" describes a shift
<br />to using electricity rather than fossil fuels for building space heating, domestic water heating, and process heating, like pool
<br />heating and cooking. Converting buildings to all -electric means that zero greenhouse gas (GHG) is emitted.
<br />We have successfully designed and implemented solar arrays on hundreds of high-performance projects. This process starts at
<br />the conceptual design level and involves consideration of building roof area, self -shading, roof obstacles, mounting techniques,
<br />utility coordination and regional factors to ensure that the project's solar potential is optimized. Our goal for your facilities would
<br />be to maximize solar generation in a way that minimizes or eliminates architectural impact.
<br />In addition, CMTA understands the unique utility tariffs and interconnection requirements for the installation of PV across the
<br />nation. Because of this understanding and our familiarity with solar system pricing, CMTA can quickly determine if a solar PV
<br />system can be included in a self -funding program. CMTA will work with the City of South Bend to assess the South Bend Central
<br />Fire Station's and MLK Dream Center's building infrastructure and determine the best path forward to decarbonization for those
<br />facilities. CMTA has recently installed the following PV systems as part of our GESC projects:
<br />Project
<br />Center Grove Community Schools Phases 1-3, IN
<br />PV System Size (k�W)Yea
<br />2,917.11
<br />2025
<br />Daviess County Schools, KY
<br />207
<br />2025
<br />Fairfax County Government Phase 3, VA
<br />307.88
<br />2025
<br />Loudoun County Public Schools Phase 8, VA
<br />505.35
<br />2025
<br />Loudoun County Public Schools Phase 7, VA
<br />240.75
<br />2025
<br />Fairfax County Government Phase 3, VA
<br />98.55
<br />2024
<br />Loudoun County Public Schools Phase 9, VA
<br />1,427.4
<br />2024
<br />Boyd County Public Schools, KY
<br />418
<br />2024
<br />Fairfax County Government Phase 3, VA
<br />98.55
<br />2024
<br />Greenbrier County Schools, WV
<br />682.3
<br />2024
<br />Fairfax County Government Phase 2, VA
<br />100
<br />2023
<br />Loudoun County Public Schools Phase 5, VA
<br />2,107
<br />2023
<br />Loudoun County Public Schools Phase 4, VA
<br />562.5
<br />2023
<br />Carroll County Schools, KY
<br />96.76
<br />2022
<br />Clinton City Schools, NC
<br />107.83
<br />2022
<br />Henderson County Schools, KY
<br />156
<br />2022
<br />Lexington -Richland School District 5, SC
<br />390
<br />2022
<br />Loudoun County Public Schools Phase 3, VA
<br />1,941.23
<br />2022
<br />Loudoun County Public Schools Phase 2, VA
<br />244
<br />2022
<br />Wood County Schools Phase 1, WV
<br />300
<br />2021
<br />Rockcastle County Schools, KY
<br />98.8
<br />2021
<br />Simpson College, IA
<br />90.44
<br />2021
<br />Breckinridge County Schools, KY
<br />132
<br />2020
<br />Loudoun County Public Schools Phase 1, VA
<br />593
<br />2020
<br />Owensboro Public Schools, KY
<br />762.57
<br />2020
<br />Big Sandy Community and Technical College, KY
<br />34.56
<br />2019
<br />Jasper County Schools, SC
<br />55.2
<br />2019
<br />Mineral County Schools, WV
<br />299.65
<br />2019
<br />Warren County Public Schools Phase 1, KY
<br />566.34
<br />2018
<br />Grant County Schools, WV
<br />499.36
<br />2018
<br />b. Describe the business unit dedicated to performance contracting, including:
<br />i. Years in business specifically in guaranteed energy savings contracting; 13
<br />ii. Percentage of total business revenue generated by performance contracting projects or related services; 55% and
<br />iii. Any local presence. CMTA's offices include a location in Indianapolis, Indiana.
<br />c. Attach summaries (maximum 1 page per project) of four projects completed by this specific branch of your firm, within the
<br />past five years, for services similar to this project. Include at least two projects with two years of guaranteed performance
<br />history. These summaries can be found in Appendix F.
<br />Page 19 Page content is proprietary and confidential
<br />6 —Technical Approach
<br />Performance Contracting I MEP Engineering I Zero Energy Engineering I Technology I Commissioning
<br />
|