My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - SBFD & MLK GESC Proj No 125-008 - CMTA
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Qualifications - SBFD & MLK GESC Proj No 125-008 - CMTA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 4:18:23 PM
Creation date
1/28/2025 11:43:42 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/28/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RFQ Response for Guaranteed Energy Savings Contract � � •• • CMTA <br />South Bend Central Fire Station & MILK Dream Center Solar PV *a.-* <br />City of South Bend, Indiana • • 0 <br />6. Technical Approach <br />a. Describe your firm's general approach to guaranteed energy savings contracting, including: <br />i. Immediate and long-term value your firm brings to Owner. <br />CMTA's approach to performance contracting is a key driver of value to each project. We believe in having the minimum numbers <br />of layers within the project team to control mark-ups and direct costs as much as possible. A summary of that approach is listed <br />below: <br />• No Sales Commissions — CMTA cuts out inefficiencies and unnecessary costs whenever possible. CMTA's delivery method <br />is different because we believe that the person who is the most qualified to present a project to Owners is a Professional <br />Engineer, not a paid spokesperson. Our Project Engineers speak frankly and honestly about the needs of the individual <br />buildings, the benefits and savings of the upgrades, and the challenges to be overcome during construction. <br />• Fully Engineered Design Documents — CMTA uses our own team of design professionals to generate a full set of biddable <br />contract documents for our projects. We have found that this practice greatly increases the quality of the work, since many <br />of the mechanical, electrical, and plumbing tradesmen live in the community of the facilities they are working in. <br />• Experts in Energy Efficient Design — CMTA is a nationally recognized expert in energy efficient design. Producing verifiably <br />more efficient designs means that we can be more aggressive in making energy savings guarantees, which in turn gives our <br />owners the opportunity to fund more work. <br />• Open Book Pricing — Every energy savings performance contract CMTA has completed features open book pricing. Not only <br />will CMTA strictly adhere to open book pricing methodology, we prefer it. We understand that every project we complete <br />is a long-term partnership, and we do not hide costs, overhead, or profit from our partners. <br />• Multiple Bids — CMTA takes multiple bids from competent local subcontractors for all scopes of work, with input from the <br />City of South Bend's personnel. CMTA can do this with the aforementioned design documents, providing the absolute best <br />in pricing from the local community. <br />• Vendor Neutral — CMTA does not sell, nor are we affiliated with, any equipment manufacturers or products of any kind, <br />allowing us to be completely neutral when it comes to selecting the best product, both in terms of quality and expense. <br />We are not locked into one particular brand as others may be, so our price discounts are always much better than the <br />competition. <br />• Local Subcontractors — CMTA believes that the best pricing for any project is through a competent local subcontractor. <br />This reduces the contractor's travel expenses, as well as keeping the money within the Owner's region. <br />• Third -Party Financing - CMTA relies on true third -party financial professionals to facilitate financing for our clients. These <br />professionals, unlike ESCOs, have a fiduciary duty to act in the best interest of the Owner. Furthermore, these professionals <br />deal in these markets daily. They have the expertise and connections to secure the best deals for the City of South Bend <br />and the knowledge to hold CMTA accountable. CMTA does not profit in any way from the financing for our projects. We <br />simply want to see our clients get the best deal possible. <br />• No Change Order Policy —Since CMTA is in charge of the project's concept, design, and construction, if there is a problem, <br />there is no one to blame except us. Therefore, all CMTA's projects carry a no excuses, Zero Change Order Guarantee. The <br />result of this approach is a project that can drive more scope for less money than our competitors. More project scope <br />allows CMTA to complete holistic renovations rather than just equipment replacements or low hanging scope, allowing <br />Owners to maximize the benefits of this delivery mechanism for their facilities. <br />In addition to driving more value on each project, CMTA is an expert in securing additional funding outside of traditional funding <br />streams. CMTA has secured over $20 million dollars in external financial assistance for our clients over the past ten years. This <br />assistance has come in the form of prescriptive and custom utility rebates; utility rate savings and reimbursements; federal, state, <br />and local grants; and interest -free financing. We are experts at maximizing the benefits of the Inflation Reduction Act for our public <br />clients. In the next three years, our clients will be securing over $130 million dollars in federal funding in response to projects that <br />we are designing and implementing. We will exhaust every opportunity to provide the City of South Bend with "free dollars" to <br />bring the maximum value possible to this project. <br />ii. Any unique qualities or capabilities of your firm that would benefit the Owner in this project. <br />CMTA's in-house solar design experts are on the forefront of rapidly evolving solar technologies to ensure that our clients <br />leverage the best available photovoltaic solutions. Our performance contracting group is uniquely qualified, based on our wide <br />range of experience within the PV industry. This includes 6 NABCEP accredited installers, inspectors, and designers. CMTA has <br />designed and installed over 180 megawatts of photovoltaic systems for our customers. <br />Page 18 Page content is proprietary and confidential <br />6 —Technical Approach <br />Performance Contracting I MEP Engineering I Zero Energy Engineering I Technology I Commissioning <br />
The URL can be used to link to this page
Your browser does not support the video tag.