My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - SBFD & MLK GESC Proj No 125-008 - Ameresco Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Qualifications - SBFD & MLK GESC Proj No 125-008 - Ameresco Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 4:16:24 PM
Creation date
1/28/2025 11:42:59 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/28/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AMERESCO <br />Green • Clean . Sustainable ° <br />How Savings Were Determined — The natural gas savings were determined by multiplying the following <br />variables: the improvement of the roof's thermal value, the roof area, the difference between the average <br />indoor temperature and average outdoor temperature in the winter, the hours per year when heating is <br />required, and the hours per week that the building is occupied. The electricity savings were determined <br />by multiplying the following variables: the improvement of the roof's thermal value, the roof area, the <br />difference between the average indoor temperature and average outdoor temperature in the summer, <br />the hours per year when cooling is required, and the hours per week that the building is occupied. <br />Measurement and Verification —The savings associated with the Roofing Replacement ECM are agreed - <br />upon. The costs associated with performing M&V on improved roof insulation are higher than the value <br />of the savings that result from the ECM. Since it is not cost effective to perform M&V, the savings are <br />considered achieved as documented in Attachment G of the ESA. <br />October 15th, 2024 <br />Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.