My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - SBFD & MLK GESC Proj No 125-008 - Ameresco Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Qualifications - SBFD & MLK GESC Proj No 125-008 - Ameresco Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 4:16:24 PM
Creation date
1/28/2025 11:42:59 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/28/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AMERESCO <br />Green • Clean . Sustainable ° <br />ECM Savings Review <br />ECM 1 — Roofina Replacement <br />Roofing, <br />jj�n�tee <br />Actual <br />otal kWh Saved = <br />16,199 <br />16,199 <br />Total Therms Saved = <br />638 <br />638 <br />Total Dollars Saved = <br />$2,021 <br />$2,021 <br />The energy savings resulting from the roofing replacement are the direct result of replacing the existing <br />EPDM membrane with new TPO and adding insulation. The roof diagram below shows the roof broken <br />down into seven sections (A through G). Sections A, C, D, E, and F received standard 20 year TPO roofing. <br />Section B received roofing installed to support the subsequent solar photovoltaic panels. Section G <br />received fully adhered TPO roofing that is capable of supporting a green roof. <br />October 15th, 2024 <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.