Laserfiche WebLink
REGULAR MEETING JANUARY 14, 2025 4 <br /> <br /> <br />KOONTZ WAGNER SERVICES <br />3801 Voorde Drive, Suite B <br />South Bend, IN 46628 <br />kwaldschmidt@kwservices.com <br /> Quotation was submitted by Mr. Kevin Waldschmidt <br /> Non-Collusion, Non-Discrimination Affidavit Form was completed. <br /> <br /> QUOTATION: <br />Base Quote $50,725 <br /> <br />Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the above <br />quotations were referred to Public Works for review and recommendation. <br /> <br />AWARD BID AND APPROVE CONTRACT – MOMENTUM SITE IMPROVEMENTS REBID <br />– PROJECT NO. 124-018R (PR-00036154) <br />Zach Hurst, Engineering, advised the Board that on December 10, 2024, bids were received and <br />opened for the above referenced project. After reviewing those bids, Mr. Hurst recommended that <br />the Board award the contract to the lowest responsive and responsible bidder, Premium Concrete <br />Services, in the amount of $463,623, Base bid plus alternate one (1). Therefore, VP Molnar made <br />a motion that the recommendation be accepted, and the bid be awarded, and the contract approved <br />as outlined above. Mr. Miller seconded the motion, which carried by roll call. <br /> <br />AWARD BID AND APPROVE CONTRACT – BEACON HEALTH PARKING LOT – <br />PROJECT NO. 123-076A (PR-00037200) <br />Zach Hurst, Engineering, advised the Board that on December 10, 2024, bids were received and <br />opened for the above referenced project. After reviewing those bids, Mr. Hurst recommended that <br />the Board award the contract to the lowest responsive and responsible bidder, Indiana Earth, Inc., <br />in the amount of $2,367,090. Therefore, VP Molnar made a motion that the recommendation be <br />accepted, and the bid be awarded, and the contract approved as outlined above. Mr. Miller <br />seconded the motion, which carried by roll call. <br /> <br />AWARD BID AND APPROVE CONTRACT – SBFD CENTRAL FIRE STATION ROOFING <br />REPLACEMENT – PROJECT NO. R124-032A (PR-00035507) <br />Lidya Abreha, Engineering, advised the Board that on November 26, 2024, bids were received and <br />opened for the above referenced project. After reviewing those bids, Ms. Abreha recommended <br />that the Board award the contract to the lowest responsive and responsible bidder, Slatile Roofing <br />and Sheet Metal Co., Inc., in the amount of $696,812. Therefore, VP Molnar made a motion that <br />the recommendation be accepted, and the bid be awarded, and the contract approved as outlined <br />above. Mr. Miller seconded the motion, which carried by roll call. <br /> <br />AWARD BID AND APPROVE CONTRACT – PUBLIC WORKS SERVICE CENTER <br />ROOFING REPLACEMENT – PROJECT NO. R124-032B (PR-00033345) <br />Lidya Abreha, Engineering, advised the Board that on December 10, 2024, bids were received and <br />opened for the above referenced project. After reviewing those bids, Ms. Abreha recommended <br />that the Board award the contract to the lowest responsive and responsible bidder, Slatile Roofing <br />and Sheet Metal Co., Inc., in the amount of $898,812. Therefore, VP Molnar made a motion that <br />the recommendation be accepted, and the bid be awarded, and the contract approved as outlined <br />above. Mr. Miller seconded the motion, which carried by roll call. <br /> <br />APPROVAL OF REQUEST TO REJECT BIDS/QUOTATIONS – BYER’S SOFTBALL <br />COMPLEX 2024 RENOVATIONS – PROJECT NO. 123-072 (PR-00036709) <br />In a memorandum to the Board, Patrick Sherman, requested permission to reject all bids and re- <br />advertise for the above referenced project due to bids not meeting MWBE Goals nor making a <br />good faith effort, and exceeding available Budget. Therefore, upon a motion made by VP Molnar, <br />seconded by Mr. Miller and carried by roll call, the above request was approved. <br /> <br />APPROVE CHANGE ORDER NO. 1 – FINAL – 2024 CURB & SIDEWALK PROGRAM< <br />DIVISION 4 - PROJECT NO. 124-009 (PO-0032685) <br />President Maradik advised that Gemma Station, Engineering, has submitted change order number <br />1 (Final) on behalf of Rieth-Riley Construction Co., Inc., indicating the contract amount be <br />increased by $13,861.81 for a new contract sum, including this change order, in the amount of