Laserfiche WebLink
Item Source Original GMP (Actual) <br />BP3-General Trades <br />Larson -Danielson <br />$ 269,589 <br />BP4-Play Equipment & Surface <br />Nu -Toys <br />$ 168,258 <br />BP5-Splash Pad Equipment <br />vortex <br />BC Mechanical <br />$ 552,685 <br />$ 139,485 <br />BP6-Plumbing & HVAC <br />BP7-Electrical <br />BP8-Sitework <br />BP9-Landscape & Irrigation <br />Pemberton -Davis <br />$ 170,650 <br />Indiana Earth <br />$ 475,870 <br />Douglas Landscape <br />$ 63,975 <br />Direct Construction Costs: Outfield Im r. Total <br />$ 2,461,311 <br />DIRECT CONSTRUCTION COSTS: Events Bldg. <br />BP1-Drilled Piers Foundations <br />BP2-Concrete <br />BP3-Polished Concrete <br />BP4-Masonry <br />Thatcher Foundations <br />$ 330,000 <br />Larson -Danielson <br />$ 880,439 <br />United Slab Solutions <br />$ 65,000 <br />Al Group <br />Waukegan Steel <br />$ 2,028,000 <br />$ 1,321,500 <br />BP5-Structural Steel <br />BP6-General Trades <br />Gibson -Lewis <br />$ 948,800 <br />BP7-Roofing <br />Midland Engineering <br />$ 514,200 <br />BP8-Aluminum and Glazing <br />Trout Glass & Mirror <br />$ 373,690 <br />BP9-Walls, Ceiling, & Paint <br />Rosema <br />$ 892,000 <br />BP10- Carpet & Rslt. Flooring <br />Infinium Floors <br />$ 28,319 <br />BP1 1-Tiling <br />Infinium Floors <br />$ 90,750 <br />BP12-Traffic Coatings <br />DC Byers <br />$ 135,000 <br />BP13-Food Service Equipment <br />Great Lakes Hotel Supply <br />$ 616,659 <br />BP14-Elevators <br />Otis <br />$ 497,100 <br />BP15-Fire Sprinklers <br />Shambaugh & Sons <br />$ 372,250 <br />BP16-Plumbing <br />DA Dodd <br />$ 1,361,100 <br />BP17-Mechanical/HVAC <br />DA Dodd <br />$ 1,174,300 <br />BP18-Electrical <br />Martell Electric <br />$ 2,495,975 <br />B P 19-AN Technology <br />TPC Technologies <br />$ 256,290 <br />BP20-Sitework <br />Indiana Earth <br />$ 690,560 <br />BP21-Furniture <br />Business Furnishings <br />$ 439,000 <br />BP22-Signage <br />See Allowance <br />$ - <br />BP23-Landscaping & Irrigation <br />Fuerbringer <br />$ 80,490 <br />Direct Construction Costs: Events Bldg. Total <br />$ 15,591,422 <br />GENERAL CONDITIONS <br />CM Staffing <br />Estimate <br />$ 1,176,447 <br />Temp. Enclosures & Heat <br />Estimate <br />$ 345,043 <br />Other General Conditions <br />Estimate <br />$ 197,541 <br />Testing & Inspections <br />Estimate <br />$ 55,680 <br />Payment, Perf., & Maint. Bonds <br />Formula <br />$ 245,818 <br />General Conditions & CM Costs Total <br />$ 2,020,529 <br />CONTINGENCIES & ALLOWANCES <br />MEP Demolition lAllowance $ 100,000 <br />GMP Exhibit 1 Page 5/39 <br />