Laserfiche WebLink
10LARSON <br />DANIELSON <br />Constmchon Company, Inc. <br />City of South Bend <br />FOUR WINDS FIELD EXPANSION & RENOVATION <br />GMP EXHIBIT 1 - ITEMIZED STATEMENT OF THE GMP <br />Item Source Original GMP (Actual) <br />PRECONSTRUCTION PHASE COSTS <br />Preconstruction Fee $ 76,500 <br />Preconstruction Phase Costs Total <br />$ 76,500 <br />DIRECT CONSTRUCTION COSTS: Upper Decks <br />BP1-Demolition <br />Larson -Danielson <br />$ 807,355 <br />BP2-Concrete <br />Larson -Danielson <br />$ 343,568 <br />B P3-Riser Systems <br />Dant Clayton <br />$ 1,160,000 <br />B P5-Masonry <br />ziolkowski <br />$ 1,104,160 <br />BP6-Structural Steel <br />Helgeson <br />$ 2,422,000 <br />BP8-General Trades <br />Larson -Danielson <br />$ 356,282 <br />BP9-Roofing <br />Midland Engineering <br />$ 745,600 <br />BP10-Doors, Frames, & Hdw. <br />LaForce <br />$ 117,874 <br />BP11-Aluminum and Glazing <br />Trout Glass &Mirror <br />$ 554,430 <br />BP12-Walls, Ceilings, & Paint <br />Kleckner Interior Systems <br />$ 1,492,698 <br />BP13A-Carpet & Rslt. Flooring <br />Infinium Floors <br />$ 71,618 <br />BP1313-Tiling <br />Office Interiors <br />$ 105,677 <br />13P14-Traffic Coatings <br />Stonhard <br />$ 43,824 <br />13P15-Food Service Equipment <br />Stafford -Smith <br />$ 370,236 <br />BP16-Field Netting <br />Sportsfield Specialties <br />$ 208,965 <br />BP18-Elevators <br />Otis Elevator <br />$ 380,345 <br />BP24-Furniture <br />Office Interiors <br />$ 364,273 <br />BP25-Field Exterior Signage <br />U.S. Sign crafters <br />$ 139,600 <br />Early A/V Work <br />TPC Technologies <br />$ - <br />BP6-General Trades (BE #3) <br />Gibson -Lewis <br />$ 97,000 <br />BP15-Fire Sprinklers (BE #3) <br />Shambaugh & Sons <br />$ 371,250 <br />13P16-Plumbing (BE #3) <br />DA Dodd <br />$ 1,217,000 <br />BP17-Mech./HVAC (BE #3) <br />DA Dodd <br />$ 1,760,000 <br />13P18-Electrical (BE #3) <br />Martell Electric <br />$ 4,973,170 <br />13P19-A/V Technology (BE #3) <br />TPC Technologies <br />$ 838,134 <br />BP20-Sitework (BE #3) <br />Indiana Earth <br />$ 12,600 <br />BP22-Signage (BE #3) <br />See Allowance <br />$ - <br />Direct Construction Costs: Upper Decks Total <br />$ 20,057,659 <br />DIRECT CONSTRUCTION COSTS: Outfield Im r. <br />131`1-Concrete <br />Larson -Danielson <br />$ 389,073 <br />BP2-Masonry <br />Larson -Danielson <br />$ 231,726 <br />GMP Exhibit 1 Page 4/39 <br />