My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order & PCA - South Well WT Plant Improvements Proj No 117-059B - C&E Excavating
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Change Orders & Project Completion Affidavits
>
Change Order & PCA - South Well WT Plant Improvements Proj No 117-059B - C&E Excavating
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 12:53:20 PM
Creation date
1/14/2025 12:26:16 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/14/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• 36-inch Storm Sewer, C-900 — Decrease <br />• Trench Stabilization — Decrease <br />Refer to Final Invoice detailing the balance of quantities and pricing adjustments. <br />Maintenance Bond, Record Drawings, Project Completion Affidavit and Final Waiver of Lien are <br />all being submitted for project record. <br />Note: A Change in Utilization of MBE/WBE was reduced during the project. Less trucking was <br />needed to remove excavation spoils of offsite materials. Materials were retained and spread <br />on -site during excavation and grading which resulted in a reduction in the utilization of <br />MBE/WBE trucking. Refer to change in utilization form. <br />The Division of Engineering and Division of Water recommend the approval of the project <br />completion affidavit along with the release of retainage. <br />For questions regarding the subject agenda request, contact Jacob M. Klosinski (Ext. 9496) at <br />the Division of Engineering. <br />
The URL can be used to link to this page
Your browser does not support the video tag.