My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order & PCA - South Well WT Plant Improvements Proj No 117-059B - C&E Excavating
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Change Orders & Project Completion Affidavits
>
Change Order & PCA - South Well WT Plant Improvements Proj No 117-059B - C&E Excavating
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 12:53:20 PM
Creation date
1/14/2025 12:26:16 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/14/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENVIRONMENTAL SERVICES <br />TO: Members of the Board of Public Works <br />Michael Schmidt, Assistant City Attorney Public Works <br />Theresa Heffner, Clerk <br />FROM: Jacob M. Klosinski, P.E., Assistant City Engineer <br />SUBJECT: 117-059B South Well Field Water Treatment Plant and Distribution <br />System Improvements — Contract B — Water Main (PROJ00000082) <br />Agenda Request — Change Order No. 2 and Project Completion Affidavit <br />DATE: January 7, 2025 <br />The Division of Engineering and Division of Water are issuing this Agenda Request to the Board of <br />Public Works for the approval of the Project Completion Affidavit for Project No. 117-059B South <br />Well Field Water Treatment Plant and Distribution System Improvements — Contract B — <br />Watermain. <br />117-059B Contract Cost Summary <br />Original Contract Sum: $1,597,000.00 <br />Contract Sum with previous Change Order: $1,620,606.65 <br />Net Change by previously authorized change orders: $ 23,606.65 <br />Current Change Order: ($ 35,798.28) <br />Final contract cost: $1,584,808.37 <br />Total percent change for entire project: -0.76% <br />Change Order No. 2 includes adjustment to final amounts for unit price items: <br />• Compacted Aggregate No. 53 — Deduct <br />• HMA Surface, Type B, 9.5mm — Increase <br />• HMA Base, Type B, 25mm — Increase <br />• 30-inch Casing with 20-inch Carrier, Granular Backfill — Decrease <br />• 24-inch Watermain, Ductile Iron, CL50, Trench Spoil Backfill — Increase <br />• 20-inch Watermain, Ductile Iron, CL50, Trench Spoil Backfill — Increase <br />• 16-inch Watermain, Ductile Iron, CL 50, Trench Spoil Backfill — Increase <br />• 12-inch Watermain, Ductile Iron, CL50, Trench Spoil Backfill — Increase <br />• 6-inch Watermain, Ductile Iron, CL50, Trench Spoil Backfill — Decrease <br />• 20-inch Butterfly Valve and Box w/ Joint Restraints — Increase <br />• 16-inch Butterfly Valve and Box w. Joint Restraints — Increase <br />• 24-inch Ductile Iron Mechanical Joint 45 Degree Bend w/ Joint Restraints — Decrease <br />• 20-inch Ductile Iron Mechanical Joint 45 Degree Bend w/ Joint Restraints — Increase <br />• 20-inch Ductile Iron Mechanical Joint 11.25 Degree Bend w/ Joint Restraints — Decrease <br />• 24-inch x 20-inch Ductile Iron Mechanical Joint Reducer w/ Joint Restraints — Increase <br />• 24-inch x 16-inch Ductile Iron Mechanical Joint Reducer w/ Joint Restraints — Increase <br />• 24-inch Ductile Iron Mechanical Joint Tee w/ Joint Restraints — Increase <br />
The URL can be used to link to this page
Your browser does not support the video tag.