Laserfiche WebLink
<br />Concept Development – Laurel St. Corridor <br />• Prepare existing conditions plan based on available GIS, aerial photography, and site visits. <br />• Develop layout concepts for the Laurel St. Corridor (from Washington St. at the northern terminus to <br />Western Ave. at the southern end). <br />• Layouts to include green infrastructure recommendations and concept designs to address known <br />Combined Sewer infrastructure along corridor. <br />• Develop material and cost estimates for budgeting purposes. <br />• Attend two review meetings (2) with the project team and prepare any revisions. <br /> <br />Compensation: <br />We will complete the above scope of services for the following lump sum fee: <br /> <br />W. Washington Topographic Survey $4,500 <br />W. Washington Engineering & Construction Documents $16,100 <br />W. Washington Bidding/Construction Administration - Hourly NTE $5,000 <br />Laurel Street Concept Development and Cost Estimates $12,500 <br />Total $38,100 <br /> <br />We will bill monthly based on the percentage of work completed. <br /> <br />Conditions and Assumptions: <br />• Any reimbursable expenses such as prints or copies are included in the fee listed. <br />• Geotechnical exploration or surveys are not included. <br />• Wetland delineation, state agency permitting, Construction Stormwater General Permit, contaminated <br />soils remediation, or other environmental work are not included. <br />• This proposal does not include preparation of ordinance variances. <br />• Troyer Group will notify City of South Bend, Division of Engineering if Project Scope changes require <br />modifications to the above-stated contract value. Services relative to scope changes will not be initiated <br />without authorization from City. <br /> <br />Please contact us with any questions regarding our proposal. <br />