My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 2 to OEA - Byer's Softball Complex Pro No 123-072 - DLZ Indiana
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 2 to OEA - Byer's Softball Complex Pro No 123-072 - DLZ Indiana
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 1:13:00 PM
Creation date
12/17/2024 1:12:56 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Page 8 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br /> <br />e. Other portions of the Agreement (including previous amendments, if any) are <br />modified as follows: <br /> <br />A. Revise Article 2, C2.01, A, 1. As follows: <br /> <br />1. Unless otherwise noted, the Owner shall pay the Engineer on a Lump Sum <br />basis, an amount of $415,650.00 based on the following estimated <br />distribution of compensation: <br />Item Description Amount Type <br />A1.01 Project Management $17,800.00 Lump Sum <br />A1.02 Site Assessment $10,500.00 Lump Sum <br />A1.03 Conceptual Planning $42,300.00 Lump Sum <br />A1.04 Opinion of Probable Cost $8,900.00 Lump Sum <br />A1.06 Topographic and Boundary <br />Survey <br />$47,100.00 Lump Sum <br />A1.07 Subsurface Utility Locates $20,000.00 Allowance <br />A1.08 Geotechnical Engineering <br />Exploration <br />$9,500.00 Lump Sum <br />A1.09 60% Design Phase $91,300.00 Lump Sum <br />A1.10 90% Design Phase $75,700.00 Lump Sum <br />A1.11 Final Design Phase $18,700.00 Lump Sum <br />A1.12 Permitting $12,050.00 Lump Sum <br />A1.13 Bid Phase Services $11,900 Lump Sum <br />A1.14 Limited Construction <br />Phase Office Services <br />$49,900 Hourly <br /> Total, Not To Exceed $415,650.00 <br /> <br /> <br /> <br />B. Revise Appendix 1 to Exhibit C in its entirety as follows: <br /> <br /> <br />Standard Hourly Rates Schedule <br /> <br />A. Standard Hourly Rates: <br />1. Standard Hourly Rates are set forth in this Appendix 1 to this Exhibit C and include salaries <br />and wages paid to personnel in each billing class plus the cost of customary and statutory <br />benefits, general and administrative overhead, non-project operating costs, and operating <br />margin or profit. <br />2. The Standard Hourly Rates apply only as specified in Article 2, C2.01. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.