My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 2 to OEA - Byer's Softball Complex Pro No 123-072 - DLZ Indiana
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 2 to OEA - Byer's Softball Complex Pro No 123-072 - DLZ Indiana
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 1:13:00 PM
Creation date
12/17/2024 1:12:56 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Page 7 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />1. The construction period is anticipated to be 8 months. A construction <br />period extending beyond this period shall be considered additional <br />services. <br />C. Limitation of Responsibilities: Engineer shall not be responsible for the acts or <br />omissions of any Contractor, Subcontractor or Supplier, or other individuals or <br />entities performing or furnishing any of the Work, for safety or security at the Site, <br />or for safety precautions and programs incident to Contractor's Work, during the <br />Construction Phase or otherwise. Engineer shall not be responsible for the failure <br />of any Contractor to perform or furnish the Work in accordance with the Contract <br />Documents. <br />D. Together with Owner, visit the Project to observe any apparent defects in the <br />Work, assist Owner in consultations and discussions with Contractor concerning <br />correction of any such defects, and make recommendations as to replacement or <br />correction of defective Work, if any. <br />E. Together with Owner or Owner’s representative, visit the Project within one <br />month before the end of the correction period to ascertain whether any portion of <br />the Work is subject to correction. <br />c. Replace Article 7 - DEFINITIONS, 7.01, A, 24 as follows: <br />24. Resident Project Representive – Not Used. Owner to provide onsite inspection <br />services. <br />d. The schedule for rendering services is modified as follows: <br /> <br /> Add to end of A1.05 Schedule: <br /> <br />Bid Phase Services <br />a) Advertise for bids November 8, 2024 <br />b) Bids Due December 10, 2024 <br />c) Anticipated Award December 17, 2024 <br /> <br />Limited Construction Phase Office Services <br />a) Construction to commence in February 2025 <br />b) Estimated 8-month duration <br />c) Substantial completion set for September 30, 2025. <br /> <br /> <br />The remainder of this page left intentionally blank
The URL can be used to link to this page
Your browser does not support the video tag.