Laserfiche WebLink
BID TABULATION #123-063BASE BIDItem No. Line Item Quantity Unit Unit Price Cost Unit Price Cost Unit Price Cost 1MOBILIZATION/DEMOBILIZATION 1 LSUM $ 7,300.00 $ 7,300.00 $ 20,148.00 $ 20,148.00 $ 16,298.00 $ 16,298.00 2MAINTENANCE OF TRAFFIC 1 LSUM $ 5,000.00 $ 5,000.00 $ 17,051.00 $ 17,051.00 $ 28,000.00 $ 28,000.00 3SIDEWALK, CONCRETE, REMOVE 40 SYS $ 50.00 $ 2,000.00 $ 105.00 $ 4,200.00 $ 185.00 $ 7,400.00 4CURBING, CONCRETE, REMOVE8LFT $ 100.00 $ 800.00 $ 105.00 $ 840.00 $ 160.00 $ 1,280.00 5EXISTING TRAFFIC SIGNAL SYSTEM, REMOVE1LSUM $ 3,000.00 $ 3,000.00 $ 4,801.00 $ 4,801.00 $ 5,500.00 $ 5,500.00 6RECONSTRUCTED STRUCTURE, HANDHOLE1EACH $ 500.00 $ 500.00 $ 1,456.00 $ 1,456.00 $ 2,806.00 $ 2,806.00 718' ALUMINUM TRUSS MAST ARM2EACH $ 2,000.00 $ 4,000.00 $ 2,776.00 $ 5,552.00 $ 5,000.00 $ 10,000.00 8HEMISPHERICAL CAMERA DETECTION SYSTEM2EACH $ 50,000.00 $ 100,000.00 $ 19,824.00 $ 39,648.00 $ 30,000.00 $ 60,000.00 93-SECTION LED TRAFFIC SIGNAL HEAD W/BACKPLATE8EACH $ 1,000.00 $ 8,000.00 $ 1,266.00 $ 10,128.00 $ 1,250.00 $ 10,000.00 103-SECTION LED TRAFFIC SIGNAL HEAD W/BACKPLATE, LEFT TURN1EACH $ 1,000.00 $ 1,000.00 $ 2,256.00 $ 2,256.00 $ 1,250.00 $ 1,250.00 115-SECTION LED TRAFFIC SIGNAL HEAD W/BACKPLATE, LEFT TURN3EACH $ 2,000.00 $ 6,000.00 $ 2,176.00 $ 6,528.00 $ 2,000.00 $ 6,000.00 12WALK/DON'T WALK SYMBOL INDICATOR W/COUNTDOWN AND PEDESTRIAN PUSH BUTTON ASSEMBLY4EACH $ 3,000.00 $ 12,000.00 $ 3,105.00 $ 12,420.00 $ 2,500.00 $ 10,000.00 13TRAFFIC SIGNAL CABLE1LSUM $ 1,000.00 $ 1,000.00 $ 20,301.00 $ 20,301.00 $ 17,000.00 $ 17,000.00 14DISCONNECT HANGER4EACH $ 500.00 $ 2,000.00 $ 926.00 $ 3,704.00 $ 400.00 $ 1,600.00 15TS 2, TYPE 2 CONTROLLER CABINET 1EACH $ 20,000.00 $ 20,000.00 $ 27,866.00 $ 27,866.00 $ 43,000.00 $ 43,000.00 16SINGLE METER SERVICE POINT CABINET AND FOUNDATION1EACH $ 9,000.00 $ 9,000.00 $ 14,994.00 $ 14,994.00 $ 28,000.00 $ 28,000.00 17SPAN, CATANARY, AND TETHER CABLE1LSUM $ 2,000.00 $ 2,000.00 $ 19,004.00 $ 19,004.00 $ 33,000.00 $ 33,000.00 18TRAFFIC SIGNAL CONDUIT, 3"60LFT $ 20.00 $ 1,200.00 $ 41.00 $ 2,460.00 $ 66.60 $ 3,996.00 19REFLECTIVE SHEET SIGN, W/LEGEND, SPAN MOUNT 115 SFT $ 16.00 $ 1,840.00 $ 46.00 $ 5,290.00 $ 150.00 $ 17,250.00 20SIDEWALK, 5" CONCRETE16SYS $ 75.00 $ 1,200.00 $ 200.00 $ 3,200.00 $ 390.00 $ 6,240.00 21CURB RAMP, 6" CONCRETE22SYS $ 300.00 $ 6,600.00 $ 435.00 $ 9,570.00 $ 520.00 $ 11,440.00 22CIRN. CPMCRETE. STANDARD 20"18LFT $ 40.00 $ 720.00 $ 125.00 $ 2,250.00 $ 170.00 $ 3,060.00 23CURB, CONCRETE, MODIFIED40LFT $ 50.00 $ 2,000.00 $ 95.00 $ 3,800.00 $ 220.00 $ 8,800.00 +10% CONTINGENCY $ 19,716.00 Base Bid Total $ 216,876.00 $ 237,467.00 $ 331,920.00 Mark Wilson, Professional EngineerProject No.123-063 Cleveland Road at Portage Avenue Traffic Signal ImprovementsMichiana Contracting, Inc.Engineer's Estimate Hawk Enterprises, Inc.I hereby certify that the above truly and accurately represents bids received for this project on November 12, 2024.J:\Projects\2024 Projects\2024-01333 Cleveland-Portage Traffic Signal Improvement\14_Bidding\Bid Tabulation\Bid Tabulation 2024-01333COSB Cleveland Portage Traffic Signal