Laserfiche WebLink
12 | CSM Group <br />PROJECT COSTS <br />Proposal Summary <br /> <br />In alignment with the RFP request, our proposal includes a summary of <br />compensation expectations for CMc services. Below and enclosed, we provide <br />a detailed summary of the total estimated costs for our services based on a <br />maximum project budget of USD 20 million. A cost matrix is included on the <br />following pages. <br /> <br />Pre-Construction Services: <br />• Duration: 6 months (Conceptual Design to Construction Documentation) <br />• Cost: $165,283.00 CMc Preconstruction Services <br />• FEE: 3.25% of the total construction cost <br />Our proposal cost includes conceptual, DD, and CD estimates. <br /> <br />Costs Incurred by Owner <br /> <br />Details of owner-incurred costs are outlined in the following pages. <br /> <br />Design Responsibility <br />No design contingency is included in this proposal, as CSM Group is not responsible <br />for the project's design. Any design changes that alter the project scope will incur <br />additional costs to the City of South Bend, Indiana. Similarly, unforeseen conditions <br />that arise during construction and create additional scope or require extra funds <br />will also be at the expense of the City of South Bend, Indiana. <br />Contract Clarifications <br />• Allowances for materials testing are specifically excluded from this proposal. <br />• Surveying of any kind is specifically excluded from this proposal. <br />• Permitting of any kind is specifically excluded from this proposal. <br />• Purchasing of goods, materials, and services pertaining to construction is not <br />included in this proposal. <br />• No Allowance or contingency for either construction or design is included in <br />this proposal <br />• This proposal does not include design or engineering, including but not limited <br />to delegated design and or investigative services. <br />• This proposal includes the following budgets: <br />• Conceptual <br />• Design Development Budget (DD) <br />• Construction Documents (CD) <br />• Should a budget be required for any other design phases CSM Group will <br />provide pricing for additional services. <br />• The proposal includes 40 hours of professional estimation for value <br />engineering support throughout the generation of the design. <br />• Cost to provide bonds, including performance, payment, and maintenance <br />bonds are not included in this proposal, and will be included in future GMP <br />Amendment. <br />• CSM Group’s obligation to perform any work or services in connection <br />with this RFP and proposal is contingent upon the parties’ execution of a <br />mutually agreed project contract to govern CSM Group's performance of <br />preconstruction and/or construction phase services.