My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Olive WTP Solar GESC Proj No 124-050 - Schneider Electric
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Proposals - Olive WTP Solar GESC Proj No 124-050 - Schneider Electric
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2024 11:27:36 AM
Creation date
12/11/2024 11:26:21 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2024
Text box
ID:
1
Creator:
Created:
12/11/2024 11:27 AM
Modified:
12/11/2024 11:27 AM
Text:
https://www.se.com/ww/en/about-us/investor-relations/regulatory-information/annual-reports.jsp
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend <br />Public Works Guaranteed Energy Savings Contract Qualifications <br />e. The most recent audited Financial Report. <br />While some companies may not want to show their financial statements, as a Fortune 500 company that has been growing for more <br />than a century, we are happy to share our financial stability and strength for this project. As such, we are including the latest, <br />abbreviated audited financial statements in Appendix B. Please see the following website to view our latest annual reports in their <br />entirety. https://www.se.com/ww/en/about-us/investor-relations/regulatory-information/annual-reports.jsp <br />f. The Provider must be certified and meet the requirements of IC 4-13.6-4 and the RFQ submitted must attach a copy of <br />the firm’s certification of qualification issued under IC 4-13.6-4. <br />Schneider Electric meets all certifications and requirements of IC 4-13.6-4. Please find our Certifications as both a designer and a <br />contractor (certified for over $10M which most providers do not possess) in Appendix A. <br />g. Describe if the Provider is a manufacturer, contractor, or engineering firm. Clearly delineate what services or products <br />the Provider is including from their own company as part of the project. <br />Schneider Electric is a number 385 on the list of Fortune 500 companies. We manufacture products, are an engineering firm, and also <br />are a general contractor. We touch over 80% of the world’s electricity once it is generated on its way to the end use. In our role as a <br />turnkey Guaranteed Energy Savings Company we provide turnkey services from initial design through guarantee and measurement <br />and verification. On a solar project like the one proposed here, Schneider Electric would typically provide all services and likely manage <br />subcontracts for the electrical, fencing, and perhaps civil work. While we manufacture many products, we often do not utilize those <br />products on these types of projects unless they make economic sense. We would discuss South Bend’s preferred manufacture for <br />items like switchgear, transformers, inverters, panels, etc. <br />Development Construction & <br />Commissioning <br />Customer Support <br />Guarantee Period <br />Program Director <br />Ty Miller, CEM, MBA <br />22 Years in the industry <br />Your point of contact throughout the project. <br />Involved with communicating to you and your key stakeholders. <br />Solar Development Engineer <br />Micheal Cooprider, NABCEP, <br />SSGB, 10 Years in the industry <br />Solar design, <br />equipment <br />specifications <br />Design intent <br />consultation <br />as needed <br />Consultation <br />as needed <br />Solar Developer <br />Ryan Stout, MBA <br />22 Years in the industry <br />Site auditing, <br />solar development and <br />design <br />Solar design intent, <br />interconnection, <br />solution development <br />Consultation <br />as needed <br />Project Manager <br />Joe Laws, CEM, NEBB <br />28 Years in the industry <br />Schedule <br />development, <br />subcontractor <br />selection <br />Cost and schedule <br />monitoring, <br />communication to <br />stakeholders <br />Consultation as needed <br />Site Superintendent <br />Scott Russell, E.P.A. <br />18 Years in the industry <br />Constructability <br />assessment <br />Daily oversight of <br />construction and <br />commissioning <br />Consultation as needed <br />Client Services Manager <br />Jeff Bowen <br />28 Years in the industry <br />Measurement & verification plan development Measurement and <br />verification, <br />performance assurance <br />Use or disclosure of data contained on this sheet is subject to <br />the restriction on the table of contents of this proposal <br />December 10, 2024 <br />Page 5
The URL can be used to link to this page
Your browser does not support the video tag.