My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Olive WTP Solar GESC Proj No 124-050 - Schneider Electric
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Proposals - Olive WTP Solar GESC Proj No 124-050 - Schneider Electric
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 2:38:52 PM
Creation date
12/11/2024 11:26:21 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Life IS On I Schneiders <br />VElectric <br />Option A Water Meter Replacement: Methodology and Savings Summary <br />The following section was included in an earlier report. It is reprinted here for consistency and to provide a full <br />picture of Year 1 savings. <br />Savings in this section are also determined by using an "Option A— Partially Measured Retrofit Isolation" <br />method as described in the International Performance Measurement and Verification Protocol (IPMVP). This <br />section describes the water meter savings calculations, key parameter measurements that were conducted, <br />estimated parameters, and how the cost savings were calculated. The water and cost savings for this ECM <br />determined using this one-time measurement approach will be the annual savings values used for each year <br />of the Performance Period. <br />The savings associated with the Water Meter Replacement ECM do not represent an increase in water <br />consumption directly. Rather, this ECM capitalizes on accurately tracking the usage of water by City of La <br />Porte customers and allows the correct billing of otherwise foregone water usage <br />Savings are calculated as the difference in total billed water consumption from the Baseline (pre -project) <br />conditions and the Performance Period conditions. It is assumed that the actual water consumption <br />between the two periods is identical but that the new water meters will more accurately capture that usage <br />and result in additional revenue for the city. Measurements were taken of the water meter accuracy both <br />before and after the project. <br />The baseline billed water consumption is simply the water consumption billed each month across all <br />accounts during the baseline period (September 2016 to August 2017). The actual baseline water <br />consumption is calculated from the billed water consumption and measured water meter accuracy. <br />The flow rates in each flow rate category were estimated. The values used in the calculations are shown <br />below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.