Life Is On I Schneider
<br />OElectric
<br />One adjustment was included in the Year 1 savings calculations. From January 4th to June 2"d 2020, 8 of the
<br />16 inverters were turned off at the direction of the electric company. An adjustment was calculated to
<br />estimate the lost production during that time. The ratio of production on each inverter compared to the
<br />total, during the months where all inverters were on, was used to fill gaps where the inverters were turned
<br />off. The estimated lost production during the months where the inverters were off was 305,315 kWh and
<br />equates to $25,501 in lost savings.
<br />Production Adjustment Impact
<br />200,000
<br />180,000
<br />160,000
<br />140,000
<br />120,000
<br />100,000
<br />80,000
<br />60,000
<br />40,000
<br />20,000
<br />0
<br />Oct-19 Nov-19
<br />Dec-19
<br />Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20
<br />■ Actual Production ■Adjustment
<br />After normalizing and adjusting, the total Year 1 and
<br />Installation period Solar production was 1,1,709,553
<br />kWh which equates to $142,787 in electric cost
<br />savings. That's $25,443 above the solar portion of the
<br />Year 1 guarantee.
<br />Adjusted and Normalized
<br />Production
<br />Month
<br />kWh
<br />$
<br />Aug-19
<br />179,176
<br />$14,965
<br />Sep-19
<br />136,676
<br />$11,416
<br />Installation Period Total
<br />315,852
<br />$26,381
<br />Oct-19
<br />90,830
<br />$7,586
<br />Nov-19
<br />49,327
<br />$4,120
<br />Dec-19
<br />35,023
<br />$2,925
<br />Jan-20
<br />55,417
<br />$4,629
<br />Feb-20
<br />69,063
<br />$5,768
<br />Mar-20
<br />123,225
<br />$10,292
<br />Apr-20
<br />148,117
<br />$12,371
<br />May-20
<br />197,451
<br />$16,492
<br />Jun-20
<br />182,223
<br />$15,220
<br />Jul-20
<br />177,147
<br />$14,796
<br />Aug-20
<br />151,656
<br />$12,667
<br />Sep-20
<br />114,223
<br />$9,540
<br />Year 1Total
<br />1,393,701
<br />$116,406
<br />Total
<br />1,709,553
<br />$142,787