My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - SRTS Muessel and Holy Cross School Area Proj No 122-006 - United Consulting
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - SRTS Muessel and Holy Cross School Area Proj No 122-006 - United Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 2:13:23 PM
Creation date
12/10/2024 2:13:13 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Permit Applications
Document Date
12/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Version 6-8-2017 <br /> 19 <br />10. Records: <br />a. Prepare and maintain at the jobsite orderly files of relevant project documentation including a <br />diary recording pertinent project information. <br />b. Maintain a set of record as-built drawings and prepare the appropriate information necessary <br />to complete a Final Construction Record. <br />11. Furnish as required, reports associated with the execution of the project work. <br />12. Prepare and submit for processing, periodic progress estimates related to payment with the <br />Contactor. <br />13. The CONSULTANT representatives will regulate their work week to generally conform to the <br />Contractor’s hours. <br />14. The Contractor shall be responsible for all safety on the project in accordance with INDOT <br />Standard Specification 107.08. The CONSULTANT shall not be responsible for supervising, <br />directing or controlling the work of the Contractor or their sub-contractors. <br />15. The CONSULTANT acknowledges and agrees that any firm or individual associated with the <br />CONSULTANT cannot accept or perform any work for the Contractor, material suppliers or <br />subcontractors on this project. <br />16. Changes to the project: <br />a. Review the claim and compare with approved contract documents <br />b. Determine the validity of the claim <br />c. Determine the work elements and costs associated with the claim <br />d. Review supporting documentation necessary to perform the changes <br />e. Determine cost and schedule impacts and method of payment <br />f. Determine impacts of change to project funding limitations <br />g. Submit to INDOT Area Engineer, LPA Representative and Designer of Record <br />h. Receive documented approval from INDOT, LPA, and Designer of Record <br />i. Input approved Change Order into Site Manager <br />j. Any approved changes to the project that impact the total project cost or extend the project <br />schedule shall be considered a substantial change to the scope of work in accordance with <br />Section 6 of this LPA-Consulting Contract
The URL can be used to link to this page
Your browser does not support the video tag.