My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Contract - Guaranteed Energy Savings Proj No 124-015 - Veregy
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Contract - Guaranteed Energy Savings Proj No 124-015 - Veregy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 2:13:01 PM
Creation date
12/10/2024 2:12:38 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Permit Applications
Document Date
12/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />28 <br /> <br />"Option D" Calibrated Simulation is a verification approach where baseline energy use is determined using a calibrated <br />simulation and is compared to a simulation of Guarantee Year energy use. Option D can involve measurements of energy use <br />both before and after the Retrofit for specific equipment or energy end use as needed to calibrate the simulation program. <br />Periodic inspections of the equipment may also be warranted. Energy consumption is calculated by developing calibrated <br />hourly simulation models of whole-building energy use, or equipment sub-systems in the baseline mode and in the post- <br />installation mode and comparing the simulated annual differences for either an average year or for conditions that correspond <br />to the specific year during either the baseline or post-installation period. Operational Verification is performed as identified <br />under Option A. <br /> <br />"Retrofit" is the work provided by VEREGY as defined by the "ECMs". <br /> <br />"Savings" is defined as avoided, defrayed, or reallocated costs. <br /> <br />“Stipulated Savings” is defined as Energy Savings that have calculated and documented using industry engineering standards. <br /> <br />"Term" shall have the meaning as defined in Section 2 hereof. <br /> <br />"Total Guarantee Year Savings" is defined as the summation of Avoided Energy, Operational and Future Costs realized by <br />Facilities in each Guarantee Year as a result of the Retrofit provided by VEREGY as well as Excess Savings, if any, carried <br />forward from previous years. <br /> <br />2. TERM AND TERMINATION <br /> <br />2.1 Guarantee Term. The Term of this Guarantee Period shall commence on the first (1st) day of the month following the <br />date of Final Project Acceptance of the Work installed pursuant to this Agreement and shall terminate at the end of the <br />Guarantee Period unless terminated earlier as provided for herein. The Term of this Guarantee Period is defined in Section 1 of <br />Attachment E. <br /> <br />2.2 Guarantee Termination. Should this Agreement be terminated in whole or in part for any reason prior to the end of <br />the Term, the Guaranteed Savings for the Guarantee Year in which such termination becomes effective shall be prorated as of <br />the effective date of such termination, with a reasonable adjustment for seasonal fluctuations in Energy and Operational Costs, <br />and the Guaranteed Savings for all subsequent Guarantee Years shall be null and void. <br /> <br />3. SAVINGS GUARANTEE <br /> <br />3.1 Guaranteed Savings. VEREGY guarantees to CUSTOMER that the identified Facilities will realize the total <br />Avoided Energy, Operational, and Future Costs through the combined value of all ECMs over the Term of the Agreement as <br />defined in Section 1 of Attachment E. In no event shall the Savings Guarantee provided herein exceed the total contract value <br />for the Work under this Agreement. Notwithstanding any other provision of this Agreement requiring savings reconciliation or <br />verification, the Total Guarantee Year Savings in each Guarantee Year are stipulated and agreed to by both parties to this <br />Agreement to equal the Avoided Energy, Operational, and Future Cost amounts set forth in Attachment E, and shall be deemed <br />realized upon the date of final Project Acceptance. The total Avoided Energy, Operational, and Future Cost and increase in <br />billable revenues due to the ECMs are guaranteed to cover the costs of the payments for the measures; and VEREGY will <br />reimburse CUSTOMER for the difference between the Guaranteed Savings and the actual Savings. <br /> <br />3.1.1 Additional Savings. Additional energy and/or operational cost avoidance that can be demonstrated as a result of <br />VEREGY's efforts that result in no additional costs to CUSTOMER beyond the costs identified in this Agreement will be <br />included in the guaranteed savings reconciliation report for the applicable Guarantee Years(s). <br /> <br />3.1.2 Savings Prior to Final Retrofit Acceptance. All Avoided Energy and Operational Costs realized by CUSTOMER <br />that result from activities undertaken by VEREGY prior to Final Project Acceptance, including any utility rebates or other <br />incentives earned as a direct result of the installed ECMs provided by VEREGY, will be applied toward the Guaranteed <br />Savings for the First Guarantee Year. <br /> <br />3.1.3 Cumulation of Savings. The Guaranteed Savings in each Guarantee Year are considered satisfied if the Total <br />Guarantee Year Savings for such Guarantee Year equals or exceeds the Retrofit and Support Costs for such Guarantee Year or <br />the amount identified in Section 1 of Attachment E hereto. <br />
The URL can be used to link to this page
Your browser does not support the video tag.