Laserfiche WebLink
<br />23 <br /> <br />office/lab in the sludge building. <br /> <br />a. New Work <br />i. Provide new 2-ton ductless, mini split unit. <br />1. Mitsubishi (or equal), 18 SEER or better with inverter driven compressor. <br />2. Mount outside unit on exterior south wall of building. <br />3. Mount inside unit on south wall of office, approximately midway on wall. Provide metal <br />covering for line set. <br />4. Provide thermostat for unit control. <br />5. Provide power from existing electrical panel. Provide a wall mounted disconnect adjacent <br />to ACCU. All conduit to be rigid except final run from disconnect to unit. <br />6. This unit to be used for cooling only and is to be locked out when existing furnace is in <br />heating. <br />ii. Provide refrigerant fill, testing and startup. <br />iii. Remove and dispose of window air conditioner. Provide metal covering in place of where air <br />conditioner is removed. Covering to be double layer of metal with insulation sandwiched between. <br />Exterior and interior of panel to be painted. <br /> <br />Exclusions: <br />i. No work on existing furnace included. <br />ii. No replacement windowpane, just flat panel as stated. <br />iii. It is assumed that an electrical circuit is available in local panel. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />