My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Contract - Guaranteed Energy Savings Proj No 124-015 - Veregy
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Contract - Guaranteed Energy Savings Proj No 124-015 - Veregy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 2:13:01 PM
Creation date
12/10/2024 2:12:38 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Permit Applications
Document Date
12/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />21 <br /> <br />b. Provide new wiring to sensors, actuators and equipment with internal controls to <br />be interfaced with. <br />c. Provide new electronic actuators for dampers and heating water valves. <br />d. Provide new software <br />i. Interface to software will be via a Graphical User Interface (GUI) that is <br />accessible by standard internet browser. Software licenses will be given <br />to Customer. <br />ii. Access can be secured with multiple levels of passwords as needed, but <br />all passwords will be given to Customer. <br />iii. GUI will include simple floor plans for navigation. Graphical <br />representation of each piece of equipment will be provided in the GUI. <br />iv. The controls will be for all the original control points without any added <br />control points. <br />3. Commissioning <br />a. The new building control system will be commissioned to be certain of correct <br />damper & valve actuation, sensor calibration, etc. The Customer will be invited <br />witness the commissioning process. <br />b. If an additional commissioning site visit is required during another season, it will <br />be provided. <br />4. Documentation & Training <br />a. Control diagrams, lists of equipment and sequences of operation will be included <br />in an operations and maintenance manual at the end of the project. This manual <br />will also include any maintenance documentation for the equipment installed as <br />well as each device’s datasheet. <br />b. A training session will be provided, not to exceed 8 hours. The session can be <br />documented or recorded. <br />c. Phone support with remote access will be provided during the one-year warranty <br />period. Any device that was installed by Veregy that fails will be replaced during <br />this period. <br />Exclusions <br /> <br />1. No demolition of wiring or pneumatic tubing in concealed spaces or above 8 feet in mechanical rooms. <br />2. No additional controls points beyond the points of control in existing system. <br />3. Controls in the generator building behind the headworks building are excluded. Controls in this building will be <br />abandoned in place. <br />4. No removal of air compressor in the generator building. <br /> <br /> <br /> <br /> <br />ECM 3 – LED Lighting Administration Building <br /> <br />The scope is as follows: <br /> <br />Remove and replace the following light fixtures / bulbs. <br />• Work to be scheduled and completed during day shift hours. <br />• Veregy and its contractors will be responsible for trash and basic cleanup of areas affected by lamp replacement. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.