My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - EVSE Installation Proj No 124-052 - Barnes Concepts
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Quotations - EVSE Installation Proj No 124-052 - Barnes Concepts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 3:05:08 PM
Creation date
12/10/2024 2:03:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4.1.2. PowerSharing TM <br />Gateways must be configured in PowerSharingTM mode for the charging stations to share <br />the power. This option must be chosen at the time of ordering to ensure the correct <br />communication gateway is delivered to you. <br />Multiple gateways may be required depending on the answers to these questions: <br />• Are the charging stations going to be in PowerSharing mode? <br />• Can all charging stations using PowerSharing mode together, communicate with the <br />same communication gateway? <br />The charging stations sharing the power of the same electrical circuit in the PowerSharing <br />configuration must be connected to the same communication gateway. This requirement <br />may impact how the charging stations' connectivity is distributed between the multiple <br />communication gateways: <br />Gateway 1 <br />i <br />PowerSharing branch <br />Gateway 2 <br />PowerSharing branch <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.