My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - EVSE Installation Proj No 124-052 - Barnes Concepts
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Quotations - EVSE Installation Proj No 124-052 - Barnes Concepts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 3:05:08 PM
Creation date
12/10/2024 2:03:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1. Introduction <br />This guide presents the instructions for the physical installation of the communication <br />gateway necessary for the physical installation and commissioning of FLO° charging <br />stations. The communication gateway is used to connect the charging stations to the <br />Charge Point Operator (CPO) backend. This backend network provides tools to monitor and <br />control the connected charging stations. <br />A gateway installation is required for all FLO networked charging stations except for those <br />with integrated gateways. Refer to the corresponding product installation guide for more <br />details. <br />2. Safety <br />Carefully read these instructions before beginning the installation. Take the time to <br />become familiar with all the parts and equipment involved before installing the charging <br />stations, operating the charging stations, or performing maintenance on the <br />communication gateway. <br />IMPORTANT SECURITY INSTRUCTIONS — KEEP THESE INSTRUCTIONS FOR FUTURE <br />REFERENCE <br />All installation, commissioning, testing, and maintenance of charging stations and <br />communication gateways must be done in accordance with the manufacturer's <br />instructions, as well as all applicable local and national standards. <br />• Use the appropriate individual protection equipment and follow the <br />practical safety standards for electrical work. <br />• Before starting, ensure the power is off on every power source <br />connected to the charging station and its associated parts. <br />• Follow the product's classification guidelines as defined in these <br />instructions. <br />NOTE: Follow the installation instructions to reduce the risk of severe injury and/or death. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.