Laserfiche WebLink
1. Introduction <br />This guide presents the instructions for the physical installation of the communication <br />gateway necessary for the physical installation and commissioning of FLO° charging <br />stations. The communication gateway is used to connect the charging stations to the <br />Charge Point Operator (CPO) backend. This backend network provides tools to monitor and <br />control the connected charging stations. <br />A gateway installation is required for all FLO networked charging stations except for those <br />with integrated gateways. Refer to the corresponding product installation guide for more <br />details. <br />2. Safety <br />Carefully read these instructions before beginning the installation. Take the time to <br />become familiar with all the parts and equipment involved before installing the charging <br />stations, operating the charging stations, or performing maintenance on the <br />communication gateway. <br />IMPORTANT SECURITY INSTRUCTIONS — KEEP THESE INSTRUCTIONS FOR FUTURE <br />REFERENCE <br />All installation, commissioning, testing, and maintenance of charging stations and <br />communication gateways must be done in accordance with the manufacturer's <br />instructions, as well as all applicable local and national standards. <br />• Use the appropriate individual protection equipment and follow the <br />practical safety standards for electrical work. <br />• Before starting, ensure the power is off on every power source <br />connected to the charging station and its associated parts. <br />• Follow the product's classification guidelines as defined in these <br />instructions. <br />NOTE: Follow the installation instructions to reduce the risk of severe injury and/or death. <br />4 <br />