My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - EVSE Installation Proj No 124-052 - Barnes Concepts
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Quotations - EVSE Installation Proj No 124-052 - Barnes Concepts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 3:05:08 PM
Creation date
12/10/2024 2:03:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Pedestal Installation <br />Anchor <br />Fig. 1: Prefabricated anchor <br />7.75" <br />[ 19.70cm ] <br />� 4 <br />19.7070cm ] <br />Fig. 2: Threaded rod spacing <br />Concrete Base <br />3.5" <br />W� <br />Fig. 3: Concrete Base <br />The installer can use a prefabricated anchor <br />offered by FLO (part number: C+VI-ANCHOR) <br />or make his own using 12" long 1/2" threaded <br />rods spaced according to the pattern shown <br />on left. <br />The base can be prefabricated or made <br />on site using concrete formwork. <br />Determine the base's height (H), depth in the <br />ground (D) and the surface area (A) of its sole <br />according to the soil type and the freeze thaw <br />specifications of the installation area. <br />Use an electrical conduit of the appropriate <br />size with a diameter of 2" or less to bring the <br />electrical cables to the center of the anchor. <br />CoRe+T" I <br />21 <br />Cable management system and pedestal installation guide <br />
The URL can be used to link to this page
Your browser does not support the video tag.