Laserfiche WebLink
5. There will be no direct payment for this work. <br />XIX. APPRENTICESHIPS <br />A. Prevailing Specifications: None <br />B. Additions: <br />1. Whether a quoter offers access to a registered apprenticeship or training program applicable to the <br />work to be performed on this project will be taken into consideration in determining whether the <br />quoter is responsive and responsible. A Contractor may demonstrate participation through an <br />apprenticeship program that is registered with the US Department of Labor or with the State of <br />Indiana in accordance with 26 U.S.C. 3131(e)(3)(B). <br />XX. PAYROLL RECORDS <br />A. Prevailing Specifications: None <br />B. Additions: <br />1. Contractor understands that the City intends to apply for elective payment of the Alternative Fuel <br />Vehicle Refueling Property Credit available under Section 30C of the Internal Revenue Code of <br />1986, as amended, (the "30C Credit") with respect to the charging stations that will be <br />installed. In order to receive this credit, the City must be able to demonstrate that it has complied <br />with the applicable Prevailing Wage and Apprenticeship requirements set forth in I.R.C. Section <br />30C(g) (the "PWA Requirements"). Contractor agrees that it, and its Subcontractors, will at all <br />times comply with the PWA Requirements, and any applicable Treasury Regulations, and that <br />Contractor will be liable to the City for any reduction in the City's available Section 30C Credit <br />attributable to Contractor's or its Subcontractors' failure to meet the PWA Requirements, <br />including any penalties or interest assessed against the City by Treasury or the IRS for a failure <br />to meet the applicable PWA requirements. <br />2. The Contractor further agrees to provide the City with such payroll records as the City reasonably <br />deems necessary to substantiate that Contractor and any Subcontractors have met the applicable <br />PWA Requirements. <br />3. Contractor shall indemnify, defend and hold harmless the City and its officers, employees and <br />agents, from and against any and all losses, costs (including, but not limited to, litigation and <br />settlement costs and counsel fees and expenses), claims, suits, actions, damages, liability and <br />expenses, occasioned wholly or in part by contractor's act or omission or negligence or fault or <br />the act or omission or negligence or fault of contractor's agents, Subcontractors, independent <br />contractors, suppliers, employees or servants in connection with this Contract, including, but not <br />limited to, those in connection with loss of life, bodily injury, personal injury, damage to property, <br />contamination or adverse effects on the environment, intentional acts, failure to pay any <br />Subcontractors and suppliers, any breach of this Contract, loss of data, data security breach, tax <br />penalties associated with PWA or other requirements, and any infringement or violation of any <br />proprietary right (including, but not limited to, patent, copyright, trademark, service mark and trade <br />secret). <br />4. Please provide the prevailing wage rate. Please note that the rate can be found here (SAM.gov). <br />5. Please list the number or laborers used. Please note that any contractor or subcontractor) that <br />employs four or more laborers or mechanics in the construction, alteration, or repair of the facility <br />must also hire at least one qualified apprentice. <br />XXI. DESCRIPTION OF WORK <br />A. Prevailing Specifications: None <br />B. Additions <br />1. Work to be performed shall include furnishing all labor, services, materials, insurance and <br />equipment to install eight (8) public electric vehicle charging stations at two (2) locations, <br />hereafter referred to as Electric Vehicle Supply Equipment (EVSE) within the City of South Bend. <br />2. Project Location: <br />a. Boland Park, 2800 Corpus Christi Dr, South Bend IN 46635 <br />b. Veterans' Memorial Park, 1621 Northside Blvd, South Bend, IN 46615 <br />Version 3/15/2024 Page - 6 Public Works Quote <br />