Laserfiche WebLink
City of South Bend Project No. 122-040A 11/12/2024 <br />DTSB to ND Trail (Notre Dame Ave) <br />Line Item Qty Unit Price Total <br />Added Signs for MOT 7 EA $194.00 $1,358.00 <br />Add Wayfinding Signage 1 LS $133,260.00 $133,260.00 <br />Additional Tree Removal 1 LS $7,095.00 $7,095.00 <br />Irrigation Repair/Extension 1 LS $76,706.55 $76,706.55 <br />Utility Conflict Sewer Modifications 1 LS $25,750.00 $25,750.00 <br />Reduce No. 53 Agg & Borrow Various Varous -$209,156.69 -$209,156.69 <br />Underground Infrastructure Underruns Various Varous -$52,930.65 -$52,930.65 <br />Removal Overruns Various Varous $78,344.10 $78,344.10 <br />Concrete Underruns Various Varous -$55,821.36 -$55,821.36 <br />CO Total =$4,604.95 <br />Other: Various over/under runs on final project line items. <br />Change Order #1 <br />Notes <br />Unforeseen: Tree roots damaged in project area; required to remove. <br />Scope: Extension of yard irrigation into newly added tree lawn space. <br />Unforeseen: Existing underground utilities required modifications to new <br />sewer structures to allow for proper drainage. <br />Scope: Addition to contract for public wayfinding signage. <br />Scope: Added to aid in traffic control.