My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
101 South Main Street_AA 2024-1014
sbend
>
Public
>
Historic Preservation
>
2024
>
December
>
Administrative Approvals
>
101 South Main Street_AA 2024-1014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 11:55:26 AM
Creation date
11/14/2024 11:55:38 AM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
101 South Main Street
HPC Document Type
Certification
HPC Local Landmark
i. South Bend
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ludowici Interlocking Tile Installation Manual: Morando 14" & 16" <br />34 www.ludowici.com <br />Morando 14" & 16" Tile Installation <br /> <br />NOTE: Each flat Interlocking field tile is provided with <br />two fastening nail holes and French field tile with one. <br />When installing field tiles or accessories care should be <br />taken to fasten each tile with nails or screws in every <br />provided fastening hole. <br />The following roof preparations must be completed <br />before installing any roof tile. <br />For detailed information on these items refer to the previ- <br />ous sections in this manual or the NRCA Manual on Steep <br />Roofing. <br />• Install the flashings required for ensuring <br />watertightness: <br /> – Eave Flashing <br /> – Rake Edge Flashing (if required) <br /> – Valley Flashing <br /> – Dormer and Sidewall Flashing, Skylight Flashing, <br />Chimney and Cricket Flashing <br /> – Vent Flashing <br />• Underlayment for the entire roof deck, including the <br />appropriate waterproof underlayments required for all <br />flashing and, where required, the ice dam membrane <br />• All cant strips and Hip and Ridge stringers should be <br />installed and covered in underlayment. <br />• Roof surface chalked with vertical and horizontal lines <br />• To avoid damaging the new roof adjoining walls, <br />chimneys and other above the roof line components <br />of the structure should be complete prior to installing <br />the tile to minimize other trades traversing the <br />completed roof. <br />Points to Remember During <br />Field Tile Installation <br />Tile installation will generally progress in a diagonal fashion, <br />moving from the starting point of the under eave tile. <br />• Use the chalk lines as a guide. <br />• Watch for any irregularities in the roof deck <br />construction. <br />• After the installation of about 75-100 tiles, the roof <br />should be inspected from the ground at a distance <br />greater than 40 feet to determine that there are no <br />streaks or blotches. To ensure a good range of tones, <br />this inspection must be done at regular intervals. <br />• When each course is 10 to 12 tiles from the terminating <br />end, compare the remaining distance to the width of <br />the tiles to determine if a slight crowding or stretching <br />of the tile may be required to ensure the last piece in <br />the course is an end band (1/2 tile) or a full tile. DO NOT <br />crowd or pull to the extreme any more than 5 or 6 <br />pieces positioned side by side. <br />V-Ridge <br />V-Closed Ridge End <br />FINISHER <br />Under Eave Tile <br />Right Detached Gable <br />Rake Tile <br />End Band Tile <br />V-Hip Starter <br />V-Hip <br />V-Ridge Terminal <br />2Hip/1 Ridge FINISHER <br />Figure 34.1 Interlocking Tile
The URL can be used to link to this page
Your browser does not support the video tag.