My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - Studebaker Museum Skylight Replacement Proj No 124-019 - Shaffner
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Quotations - Studebaker Museum Skylight Replacement Proj No 124-019 - Shaffner
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2024 3:45:10 PM
Creation date
11/12/2024 3:44:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CITY OF SOUTH BEND <br />STUDEBAKER NATIONAL MUSEUM <br />SKYLIGHT REPLACEMENT TRANSLUCENT SKYLIGHTS 08952-4 <br />e. Skylight-System Sealants: Compatible with components with which sealants come in <br />contact and recommended by skylight and sealant manufacturers for this use. <br /> <br />3. Fabrication, General: <br /> <br />a. Aluminum Components: As follows: <br />1) Fabricate components that, when assembled, will have accurately fitted joints with <br />ends coped, mitered, or butted to produce hairline joints free of burrs and <br />distortion. <br />2) Fabricate components to drain water passing joints and to drain condensation and <br />moisture occurring or migrating within assemblies to the exterior. <br />3) Fabricate components to accommodate expansion, contraction, and field <br />adjustment and to provide for minimum clearance and shimming at assembly <br />perimeter. <br />4) For shapes with sharp profiles, straight and free of defects of deformations, before <br />finishing. <br />5) Fit and assemble components to greatest extent practicable before finishing. <br />6) Reinforce members as required to retain fastener threads. <br />7) Where fasteners are exposed to view from interior, countersink fastener heads and <br />finish them to matching framing. <br />8) Before shipping, shop-assemble, mark, and disassemble components that cannot <br />be permanently shop assembled. <br /> <br />b. Fiberglass-Sandwich-Panel Fabrication: As Follows: <br />1) Laminate face sheets to grid core under a controlled heat-and-pressure process <br />with straight adhesive bonding lines that cover the width of core members and that <br />have sharp edges. <br />2) White spots indicating lack of bond at intersections of grid core members are <br />limited in number to 4 for every 40 sq.ft. of panel and limited in diameter to 3/64". <br />3) Fabricate with grid pattern that is symmetrical about centerlines of each panel. <br />4) Fabricate panel to allow condensation within the panel to escape. <br />5) Reinforce panel corners. <br /> <br />4. Translucent Roof Panels: <br /> <br />a. Grid Pattern: <br />1) 12" x 24" nominal shoji <br /> <br />b. U-Value per ASTM C236: <br />1) No greater than 0.30 Btu/sq.ft. x h x deg F. <br /> <br />c. Interior Face Color: <br />1) Clear “Crystal” <br /> <br />d. Exterior Face Color: <br />1) Clear “Crystal” <br /> <br />5. Components and Accessories: <br /> <br />a. Panel Grid: Fabricate the panel grid core from extruded 6063-T6 aluminum I-beams. <br />Mechanically interlock the muntin and mullion I-beam grid to prevent variations in <br />alignment at intersections and to minimize bond skips. <br /> <br />b. Translucent Facing: Fabricate panels using fiberglass face sheet metal manufactured <br />with uniform color which is free of ridges, wrinkles, clusters of air bubbles and pinholes
The URL can be used to link to this page
Your browser does not support the video tag.